APQP on Zoho · Zoho Advanced Partner
APQP software on Zoho, with gate reviews that hold a launch to its evidence
Yes, Zoho can run your APQP programme tracking. We set up each new part launch as a project in Zoho Projects, with the five APQP phases as milestones, and build a gate review app in Zoho Creator where your cross-functional team scores every deliverable and signs the gate. FMEA, SPC and CAD tools stay where they are; Zoho holds the plan, the status and the proof.
- Zoho Advanced Partner
- 300+ projects for Indian businesses since 2021
- Quality team training in English, Hindi, Marathi, Tamil, Kannada or Malayalam
We reply within 1 business hour · No obligation · Or sort your gate review problems first
Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner
Your starting point
How do you track APQP today, and what would Zoho change?
Most suppliers we speak to already run APQP; the gap is in how the status is kept. Pick the closest match to see what moves into Zoho and what we would leave alone.
From an Excel timing chart: what changes
Today
- The NPD engineer keeps the master copy, and three older copies float around
- A gate is "passed" when the review meeting ends, whatever the open points
- Evidence sits in personal folders and email attachments
After the setup
- One project per launch, with each phase as a milestone and every output as a task
- The gate closes only when each deliverable has a score and an owner has signed
- Every file is linked from the deliverable it proves
We import the timing chart you already use, so the first Zoho project looks familiar. Your team keeps the same deliverable names; only the place they live changes.
Move my timing chart to ZohoFrom customer portals only: what changes
Today
- Each OEM portal shows its own programmes, and nobody sees all of them together
- Internal tasks before an upload are tracked on a whiteboard
- Management asks the quality head for a status every Monday
After the setup
- All launches, across customers, on one internal board
- Internal preparation tracked as tasks before anything goes to a portal
- A dashboard answers the Monday question without a meeting
Customer portals stay the official place for submissions. Zoho becomes your internal view, with the portal reference stored on each programme so nobody hunts for it.
Plan my internal APQP boardFrom Zoho Projects without gates: what changes
Today
- Tasks exist, but phase ends are just dates on a Gantt chart
- Templates differ by engineer, so no two programmes compare
- Gate outcomes are written in meeting minutes
After the setup
- A single project template with the five phases and agreed outputs
- A Creator gate app that pulls deliverables from the project
- Gate result, conditions and actions stored against the programme
Your licenses and history stay. We add the template, the gate app and the dashboards around what you already run.
Add gate reviews to my ZohoBeside a QMS suite: what changes
Today
- The suite holds FMEA and control plans, and only quality engineers log in
- Purchase, tooling and sales track their launch tasks elsewhere
- Gate meetings start by collecting updates from each function
After the setup
- The QMS suite stays the home for FMEA and control plan documents
- Every function's launch tasks sit in Zoho Projects
- Gate meetings open on a scorecard that is already filled in
This is often the honest answer: keep the suite for what it does well, and give the rest of the company a simple place to plan and report. We link the two where an API exists.
Check whether Zoho fits beside my QMSInside the setup
What does an APQP gate review look like in Zoho?
Four screens from a sample launch of a die-cast bracket for a two-wheeler programme: the phase plan, the Phase 3 gate scorecard, the evidence index and the management board. The part, the customer and every figure are invented.
Phase plan Sample · bracket BR-204, one project in Zoho Projects
| Phase (milestone) | Typical outputs as tasks | Gate owner | Status |
|---|---|---|---|
| 1 Plan and define | Design goals, preliminary BOM, special characteristics list | Programme manager | Gate passed |
| 2 Product design | DFMEA reference, drawing release, design verification plan | Design lead | Gate passed with 2 conditions |
| 3 Process design | Process flow, PFMEA reference, pre-launch control plan, tooling plan | Process engineering | Gate review due |
| 4 Validation | Trial run, MSA, initial capability, production control plan, PPAP | Quality head | Not started |
| 5 Feedback | Lessons learned, early production containment exit | Plant head | Not started |
Phase names follow the customer's or your own manual; we copy them as you use them rather than renaming them.
Gate 3 scorecard Sample · scored by the cross-functional team
| Deliverable | Owner | Score | Note |
|---|---|---|---|
| Process flow diagram | Process engineering | Green | Rev B attached |
| PFMEA | Quality engineer | Amber | Two high-risk items without actions |
| Pre-launch control plan | Quality engineer | Green | Linked to PFMEA rev |
| Die and fixture readiness | Tool room | Red | Trim die delivery slipped |
| Packaging proposal | Logistics | Green | Customer comments closed |
A red line cannot be hidden by a good average: the gate result is Pass, Pass with conditions or Hold, and conditions become dated tasks back in the project.
Evidence index Sample · one folder per part, one sub-folder per phase
| File | Proves | Kept in | Revision |
|---|---|---|---|
| BR-204 PFMEA export | Gate 3, PFMEA | Your FMEA tool, PDF copy in WorkDrive | Rev C |
| Process flow | Gate 3, process flow | WorkDrive | Rev B |
| Capability study, hole position | Gate 4, initial capability | SPC software, summary in WorkDrive | Pending |
| Gauge R&R, bore gauge | Gate 4, MSA | Lab records, PDF in WorkDrive | Pending |
The tool that creates a record stays its master. WorkDrive keeps the released copy the gate was judged on, so the review can be traced later.
Launch board Sample data · all active programmes
Built in Zoho Analytics or a Creator report, depending on how many programmes you run and who needs to see them.
Scope and limits
What does Zoho do in APQP, and what stays in your quality tools?
Zoho plans, tracks, scores and reports the launch. It does not write your FMEA, calculate capability or replace a validated QMS. We say this in the scope so nobody expects Zoho to do a quality engineer's analysis.
Built in Zoho for your launches
- A project template in Zoho Projects with your phases, outputs, owners and dependencies
- New launches created from a nomination or a won RFQ in Zoho CRM, if you use it
- A gate review app in Zoho Creator: checklist, score, conditions, sign-off
- Folder rules in Zoho WorkDrive so each file sits under its part and phase
- Reminders and escalations when a deliverable passes its due date
- A board for management showing every launch by phase and gate result
- Role-based training for NPD, quality, purchase and tool room users
Left in your quality and engineering tools
- FMEA authoring and risk ranking, in your FMEA tool or spreadsheet
- SPC charts, capability and MSA studies, in your statistics software
- Drawings, models and engineering change control, in CAD or PLM
- Official PPAP submissions, through each customer's portal or format
- Shop-floor execution and machine data, in your MES or ERP
- Your Zoho license invoice, raised by Zoho itself
APQP is a planning framework published for the automotive industry; your customer's manual and your quality head decide how it is applied. We configure Zoho to record that method. We do not certify a process or sign anything on your behalf. The submission side is covered on our PPAP workflow page.
Options
Spreadsheet, Zoho or a dedicated APQP suite: which fits your launches?
A dedicated quality suite suits a supplier whose customers expect FMEA, control plans and APQP linked in one validated tool. Zoho suits a supplier who needs every department on the same launch plan at a lower license cost. Select a row to hold its APQP comparison in view.
| Point | SpreadsheetTiming chart in Excel | Zoho Projects and CreatorSet up by Elite Tech CorpThis page | Dedicated APQP suiteQuality software vendor |
|---|---|---|---|
| Who uses it day to day | Whoever holds the file | Every launch function, by role | Mostly quality engineers |
| Gate decision recorded | In minutes, if at all | Score, conditions and sign-off per gate | Yes, built in |
| FMEA and control plan linkage | Manual | Linked by reference to your FMEA tool | Usually native |
| Change to your own phases | Edit the sheet | Template and app edited without code for most changes | Configuration by the vendor or an admin |
| Link to sales, purchase and accounts | None | Zoho CRM, Books and Inventory on the same platform | Through integrations |
| License cost basis | Already owned | Per user, at Zoho's published India prices | Set in each vendor's own quote |
| Fits when | One or two launches a year | Several launches at once, many departments involved | Customer audits expect one integrated quality system |
Not sure which column you are in? Bring your last customer audit report to the fit assessment and we will tell you plainly.
What gets built
What will your launch team actually receive?
Six working pieces make up an APQP setup on Zoho. Tap a card to see what goes inside each one.
Which Zoho Projects features you get, such as task blueprints or custom statuses, depends on the edition. Each gate feature in the scope is matched to a named Zoho Projects edition before any license is bought.
By part type
Does the gate checklist change with the kind of part you make?
Yes. The five phases stay, but the deliverable that most often holds a gate differs between a casting, a machined part, a moulded part and a wiring harness. These are illustrative starting checklists, which your quality head edits.
Castings and forgings
Pattern or die development sets the pace, and sample lots are often made at an outside foundry or forge shop before the plant line is ready.
- Method design
- Pattern or die
- Sample lot
- Metallurgy report
- Gate 4
- Key deliverablesSimulation summary, sample lot results, heat treatment records
- Setup noteOutside-supplier tasks with their own due dates and reminders
- Watch forLab reports stay in the lab system; WorkDrive keeps the released PDF
Machined parts
Fixtures, programs and gauges decide whether the trial run happens on time, and capability on a few tight features decides the validation gate.
- Drawing review
- Fixture design
- CNC program
- Gauge ready
- Trial run
- Key deliverablesFixture approval, gauge list, capability on special characteristics
- Setup noteTool room tasks linked to the drawing release task
- Watch forMachine data and programs stay on the shop floor, not in Zoho
Moulded plastic and rubber components
Mould trials come in rounds, and each round brings dimensional and appearance comments that must close before the next one.
- Mould design
- T0 trial
- T1 trial
- Colour and finish
- Gate 4
- Key deliverablesTrial reports per round, material approval, appearance approval
- Setup noteA repeating trial task with its own comment list in Creator
- Watch forMoulds owned by the customer need their asset tag on the project
Harnesses, cables and electrical sub-assemblies
Many bought-out connectors and terminals mean the purchase team owns a large share of the launch risk.
- Circuit review
- Component sourcing
- Board layout
- Electrical test
- Gate 4
- Key deliverablesApproved component list, test plan, crimp validation summary
- Setup notePurchase tasks per component family with supplier due dates
- Watch forTest bench results stay in the test system; the summary is linked
EV assemblies
Battery, motor and controller parts arrive with short programme timelines and frequent design changes, so gates reopen more often.
- Design freeze
- Proto build
- Change review
- Validation build
- Gate 4
- Key deliverablesChange log, safety-related characteristic list, validation build report
- Setup noteA change request form that reopens only the affected deliverables
- Watch forEngineering change control stays in PLM; Zoho records its effect on the launch
License cost
What do Zoho licenses for APQP tracking cost?
Most setups need Zoho Projects for everyone who owns launch tasks and Zoho Creator for the people who score and sign gates. Pick a plan and a user count to see the license cost at Zoho's India list prices.
- Each figure is per user per month, plus GST
- Zoho bills the licenses; our setup is quoted apart
- One button sends this figure to our team with your form
How our APQP setup is priced
What grows the scope
The number of customer-specific gate checklists, how many departments get their own views, links to an FMEA tool or ERP, and how many past launches you want loaded.
What stays free
Our opening call costs nothing, and neither does the Zoho fit assessment. If your launch process needs a written study before we can quote, we say it is paid and quote it up front.
What you sign
A scope with every template, app and report listed, plus training and the support period, at one fixed price. New asks after sign-off go through a change note you approve.
Connections
Which systems does the APQP setup connect to?
Inside Zoho the links are native. Quality and engineering tools outside Zoho connect only where they offer an API or a file export, and the scope names the type of each link before work starts.
Zoho Projects and Creator Native
The gate app reads deliverables from the launch project and writes gate conditions back as tasks.
Zoho WorkDrive Native
Folders created per launch, with file links shown on the project and on each gate line.
Zoho CRM Native
A won RFQ or nomination can start the launch project, carrying the part number and customer programme code.
FMEA and SPC software Custom
Revision numbers or summary results pulled in where the tool has an API; otherwise a released PDF is linked by hand.
ERP or Tally Custom
Item codes and tooling purchase orders shown on the launch, through an API or a scheduled sync. Connecting Zoho to ERP and Tally
Zoho Cliq and email Native
Overdue deliverables and gate invitations sent to the owner and the gate approvers.
How we work
How is an APQP setup on Zoho delivered?
We follow our 12-step track, grouped into four stages. For APQP it means one real launch is walked through gate by gate before anything is configured, and your team tests the gate app on a live programme.
Stage 1
Understand
- Discovery call
- Workflow mapping
- Scope and budget
Your programme manager and quality head take us through a recent launch, including the gate that slipped.
Stage 2
Agree
- BRD sign-off
- Kickoff
- Delivery schedule
Phases, deliverables, scoring rules and approvers are written down and signed by your quality head.
Stage 3
Build
- Sprint plan
- Build
- Review demos
The project template comes first, then the gate app, folders and the management board, each shown in a demo.
Stage 4
Launch
- Testing
- Training
- Go-live and support
One live programme runs a real gate in Zoho with us in the room, then the other launches move across.
The full sequence is laid out on our 12-step delivery road. Need Creator work beyond the gate app? Read about Zoho customisation and development.
Your priorities
Which gate review problems should Zoho fix first?
Go through eight problems that slow part launches. Keep the ones you recognise and we will shape them into a first-phase scope for your fit assessment.
Working together
Can you run the APQP workshop at our plant?
Yes, for the steps that need the floor in front of us. Most of the work happens on video calls, and we visit the plant for the launch walk-through and the first live gate. Our offices are in Bangalore, Coimbatore and Kochi; supplier teams elsewhere in India work with us remotely and on planned site visits.
Bangalore
Meetings by appointment at our Vasanth Nagar office, and plant visits around Peenya, Bommasandra and Hosur Road
Pune, Chakan and Aurangabad
Our Bangalore team works with auto suppliers in these belts on video calls, with on-site visits for the gate workshop. Zoho partner for Pune
Tamil Nadu
Suppliers around Coimbatore and Hosur can plan a session at our Coimbatore head office
Kerala
Quality teams from Kerala can book a gate workshop at our Kochi branch
Gate owners trained in their own language
Gate owners and approvers learn in English, Hindi, Marathi, Tamil, Kannada or Malayalam, so shop-floor and tool room leads are not left out.
Auto suppliers in Pune can also read our Zoho page for Pune auto suppliers, and Bangalore suppliers our Bangalore auto components page.
Client words
Before you trust us with a launch, read what clients wrote
These come from clients in a range of industries and appear here as they do on our site. The APQP screens above are samples, not client data.
The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
FAQ
APQP on Zoho: questions quality heads ask
Prefer to talk it through with a consultant? We reply within 1 business hour.
Book my free Zoho fit assessmentCan Zoho be used as APQP software?
Yes, for planning, tracking and recording gate reviews. Zoho Projects holds each launch with the five phases as milestones and the outputs as tasks, and a Zoho Creator app records gate scores, conditions and sign-off. Analysis tools such as FMEA, SPC and MSA software stay separate, and Zoho links to their released results.
What are the five APQP phases, and where does each gate sit?
The phases are plan and define the programme, product design and development, process design and development, product and process validation, and feedback with corrective action. A gate review closes each phase. We set up the phase and gate names exactly as your customer's manual or your own quality manual uses them.
Does an APQP setup on Zoho make us IATF 16949 compliant?
No. Compliance comes from your quality system, not from a tool. Zoho records the method your quality system defines, and your quality head and your customer's supplier quality team judge whether it meets their requirements. We configure the tracking; we do not certify processes or sign gates for you.
Can we keep our existing FMEA and control plan tool?
Yes, and usually you should. The FMEA tool stays the master for risk analysis and control plans. Zoho stores the revision that each gate was judged on and links to the released file, and where the tool has an API we can pull the revision number automatically.
How is APQP on Zoho different from your PPAP workflow?
APQP covers the whole launch, from nomination to early production, across every department. PPAP is the submission package at the validation stage. Many suppliers use both: the APQP project creates the PPAP task, and the PPAP tracker handles the elements and customer approval.
Which Zoho licenses do we need, and what do they cost?
Usually Zoho Projects for everyone who owns launch tasks and Zoho Creator for the people who score and approve gates. Zoho Projects starts at ₹280 per user per month on Premium and Zoho Creator at ₹480 per user per month on Standard, both billed yearly and plus GST. We confirm the editions after the fit assessment.
Can different customers have different gate checklists?
Yes. The gate app holds a checklist per customer or per programme type, picked when the launch project is created. Your quality head can add or retire checklist items later without a developer for most changes.
What does your APQP setup cost?
Our work is one fixed price set out in the scope you sign, so we do not publish a rate card. There is no charge for the opening call or the Zoho fit assessment. Zoho licenses are separate and billed to you by Zoho.
Do you work with suppliers outside Bangalore?
Yes, across India. Our offices are in Bangalore, Coimbatore and Kochi, and suppliers in places such as Pune, Chakan and Aurangabad work with our team on video calls, with plant visits for the launch walk-through and the first live gate.