OEE dashboard for manufacturing: what to show and how to build it
An OEE dashboard shows how much of a machine's planned time turned into good parts. OEE is availability times performance times quality. A useful board puts plant OEE on top, then the three factors for each machine and shift, a Pareto of stoppage reasons, and a weekly trend. Plants with older machines can start from a shift log on a tablet; machine signals can be added later.
We reply within 1 business hour · No obligation
Sample · Shift B, CNC turning cell 3
67.7%OEE this shift
Biggest loss: 40 minutes waiting for bar stock
Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner
Three ratios, one product
How is OEE calculated for one machine on one shift?
Divide run time by planned production time for availability, ideal output time by run time for performance, and good parts by total parts for quality. Multiply the three. The shortcut gives the same answer: good parts times ideal cycle time, divided by planned production time.
Planned production time is the shift minus the stops you planned on purpose: tea and lunch breaks, a scheduled preventive maintenance slot, or a shift with no orders loaded. Everything else that stops the spindle counts against availability, whether it was a tool change, a breakdown or the operator waiting for the first-piece approval.
Performance asks whether the machine ran at its ideal speed while it was running. Short stops of a minute or two, which nobody writes down, show up here. Quality counts only parts that passed first time; reworked parts count as losses even if they ship.
- Planned time
- 480-minute shift less a 30-minute break = 450 minutes.
- Stoppages
- Power cut 25 minutes, tool change 20, waiting for bar stock 40. Total 85, so run time is 365 minutes.
- Availability
- 365 divided by 450 = 81.1%.
- Performance
- Ideal cycle 45 seconds, 418 parts made. 418 x 45 seconds = 313.5 minutes of ideal work, divided by 365 = 85.9%.
- Quality
- 12 rejects, so 406 good of 418 = 97.1%.
- OEE
- 81.1% x 85.9% x 97.1% = 67.7%. Check: 406 good x 45 seconds = 304.5 minutes, divided by 450 = 67.7%.
Sample. All shift figures above are invented to show the arithmetic.
Try it on your own shift
What is the OEE of your machine right now?
Enter one shift from your production register. The calculator splits the result into the three factors and names the largest loss, so you know which tile your dashboard needs first.
- Use the ideal cycle time from the process sheet or the best run you have proved, not a guess.
- Count rework as rejects for OEE purposes.
- Nothing is sent until you press the button and fill in the form.
Availability81.1%
Performance85.9%
Quality97.1%
OEE67.7%
Largest loss: availability. Start with a stoppage reason Pareto.
Estimate only. Based entirely on the figures you type in.
What goes on the screen
Which tiles should an OEE dashboard for manufacturing include?
Eight tiles cover most plants: plant OEE, the three factors, a stoppage Pareto, a machine-by-shift grid, a reject reason chart and a weekly trend. Tap a card for what it shows, where the data comes from and who reads it.
Suggested starting layout. Your own reason codes and machine groups decide the final board.
Where the minutes go
What are the six big losses, and how do they look on an Indian shop floor?
Two losses hit availability, two hit performance and two hit quality. Your reason codes should map to these six so the Pareto rolls up cleanly into the three factors.
- Breakdowns (availability). A hydraulic leak on a press, a spindle bearing failure, a grid outage before the DG set picks up the load.
- Setup and changeover (availability). Die changes, fixture swaps, first-piece inspection waits. On high-mix job shops this is often the largest code.
- Small stops (performance). Chip clogging, a sensor trip, a bin to empty. Too short to log by hand, so they appear as a performance gap.
- Reduced speed (performance). Feeds turned down on an old machine, or an operator running cautiously on a new part.
- Startup rejects (quality). Parts scrapped while settings stabilise after a changeover or a cold start.
- Process defects (quality). Dimensional rejects, blowholes in castings, burrs that need rework at the deburring bench.
Two codes are worth adding for Indian plants. "Waiting for material" separates stores and purchase delays from machine faults, and "Job work part awaited" covers components out with a subcontractor for plating or heat treatment. Without them, those minutes land in "Others" and the board blames maintenance.
Local detail
What do Indian plants need to settle before trusting the OEE number?
Four definitions: what counts as planned time, which ideal cycle time to use, how power cuts are coded, and how shifts roll over at midnight. Agree them in writing first, or every review becomes an argument about the formula.
Power cuts and DG changeover
Count them as unplanned downtime with their own code. Hiding them inside planned time makes OEE look better while the loss stays.
Ideal cycle time
Old machines rarely run at their catalogue rate. Use the best rate your process sheet or a proven run supports, and keep it per part, not per machine.
Three shifts and midnight
Tag each log with a shift date, so the C shift that ends at 6 am stays with the day it started.
Contract labour and skill
Record the operator on each shift log. Training gaps then show up as a pattern instead of a suspicion.
Getting the data in
Do you need machine sensors before you can build an OEE dashboard?
No. Most plants start with a structured shift log on a tablet and get a usable OEE within weeks. Sensors and PLC signals add the short stops a person cannot log, and can come later on the machines that matter most.
Today: paper register
- Stoppages written as free text, often at shift end
- Counts copied into Excel the next morning
- Reason "machine problem" covers half the minutes
- OEE worked out once a month, if at all
With a tablet log in Zoho Creator
- Operator picks a reason code and start and end time
- Supervisor approves counts and rejects before handover
- Each entry lands in Zoho Analytics on a refresh schedule
- Shift OEE visible to the plant head the same day
Configured: Zoho Creator
Shift log app
Forms for stoppages, counts and rejects, with machine, part and reason code lists the plant controls.
Native: Zoho Analytics
Formulas and dashboard
Creator data reaches Analytics through its built-in connector; formula columns compute the three factors.
Custom or third-party
Machine signals
An IoT gateway or MES that reads run and stop signals passes them on by API, often through a small Zoho Catalyst function.
Step by step
How do you build an OEE dashboard in Zoho?
Build the capture app, agree reason codes, connect it to Zoho Analytics, add formula columns, then design the board per role. A pilot on three or four machines proves the definitions before the whole floor goes live.
- Write the definitions down. Planned time, ideal cycle per part, what counts as a reject, shift date rules.
- Set up the masters. Machines, parts with ideal cycle times, operators, and 10 to 15 reason codes mapped to the six losses.
- Build the shift log in Zoho Creator. One screen per machine per shift: stoppages, total count, rejects by defect. Big buttons, works on a shop-floor tablet.
- Connect Creator to Zoho Analytics. Use the built-in connector with a refresh schedule that suits your shift pattern.
- Add formula columns and the board. Availability, performance, quality and OEE per log, then the eight tiles above, with plant, supervisor and maintenance views.
- Pilot, then widen. Run three or four machines for a few weeks, fix the codes that drift into "Others", then add the rest.
Zoho does not sell an MES or machine control software, and this setup does not replace one. If you already run an MES, Zoho Analytics can read from its database or export and sit beside your ERP data. Zoho describes its connectors on the Zoho Analytics product pages and its app builder on the Zoho Creator site.
On cost, Zoho Creator Standard is listed at ₹480 per user per month billed yearly, plus GST (Zoho Creator pricing, checked November 2026). Zoho Analytics editions are billed separately; check the current edition limits with Zoho before you buy. Our Zoho Analytics implementation service covers the capture app, the connector and the board as one fixed scope, quoted after the free fit assessment. For the wider factory picture of work orders, stock and dispatch, see Zoho for shop floor management and our manufacturing ERP page.
Avoid these
Why do OEE dashboards stop being used after a few months?
Usually because the number became a stick, the codes became vague, or nobody acted on the Pareto. A board survives when one person owns each top loss and reports on it every week.
Chasing a benchmark
An 85% figure is often quoted in maintenance literature. Comparing a machine with its own last quarter tells you far more.
Ranking operators
Once OEE is used to blame people, the logs quietly improve while the floor does not.
Too many codes
Forty reason codes on a tablet means operators pick the first one. Keep it short and review monthly.
No action column
Each week, the top three losses get an owner and a date. Track those actions on the board itself.
About this guide
Who wrote this OEE guide?
The Elite Tech Corp team wrote it: a Zoho Advanced Partner with 300+ Zoho projects since 2021. The quotes below come from clients in a range of industries, and every figure in this article is a sample.
If you want to sit down with the board in person, our Zoho Analytics consultants in Bangalore meet by appointment at the Vasanth Nagar office; plant teams elsewhere in India work with us over video, and we travel to the floor if the pilot needs it. Operators and supervisors can learn the shift log in English, Hindi, Marathi, Tamil, Kannada or Malayalam.
The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
FAQ
OEE dashboards: questions plant heads ask
Bring one week of shift registers to the call and we will map them to reason codes with you.
Book my free Zoho fit assessmentWhat is a good OEE score for an Indian manufacturing plant?
There is no single target that fits every plant. A high-mix job shop with frequent changeovers will sit well below a dedicated line running one part. Measure each machine honestly for a few weeks, then aim to improve on its own baseline quarter by quarter.
How do you calculate OEE for a machine?
Multiply availability (run time divided by planned production time), performance (ideal cycle time times total parts, divided by run time) and quality (good parts divided by total parts). The same result comes from good parts times ideal cycle time, divided by planned production time.
Should lunch breaks and planned maintenance count as downtime in OEE?
No. Scheduled breaks and planned preventive maintenance are taken out of planned production time. Breakdowns, changeovers, power cuts and waiting for material stay in, because they are the losses the dashboard exists to show.
Can I build an OEE dashboard without connecting my machines?
Yes. A structured shift log on a tablet, with reason codes, counts and rejects, gives a usable OEE for most plants. Short stops are harder to capture by hand, so performance may read a little high until machine signals are added on key machines.
Can Zoho Analytics calculate OEE?
Yes, through formula columns on your shift log data. Zoho Analytics does not collect machine data itself; the data comes from a Zoho Creator log, your ERP, an MES or an IoT gateway, and Analytics turns it into availability, performance, quality and OEE charts.
How often should an OEE dashboard refresh?
For shift-log data, a refresh every hour or at each shift change is usually enough. Plants feeding machine signals may want faster refreshes on the supervisor view, while the owner's weekly view can stay on a daily refresh.
Is OEE the same as machine utilisation?
No. Utilisation only asks whether the machine was running against the time available. OEE also asks how fast it ran and how many good parts it made, so a busy machine making scrap can show high utilisation and poor OEE.