Solar guide · Survey to quote
Solar site survey workflow: what to include at each stage
A good solar site survey workflow covers more than the roof visit. It starts when a customer asks for a site check, runs through a desk review of the electricity bill, the visit itself, a same-day quality review and a clean hand-off to design, and ends only when the quote goes out without anyone calling the customer back for a missing detail. This guide lists the stages, the fields and photos each stage should capture, who owns each hand-off, and what changes for terraces, sheds and ground plots.
We reply within 1 business hour · No obligation
Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner
What this guide covers
- The eight stages of a survey, from the customer's first request to the quote that follows it.
- The fields every survey record should carry, grouped so a designer can work without a call.
- A photo shot list that stops the second visit most installers know too well.
- How the workflow changes for an apartment terrace, a factory shed and a ground-mounted plot.
- Which parts Zoho handles directly and which need configuration or a custom app.
What is a solar site survey workflow?
It is the agreed sequence of steps, owners and required details that turns a "please check my roof" request into data a designer can trust. The visit is one step in the middle. The workflow also fixes what happens before it, so the surveyor arrives prepared, and after it, so nothing sits in a phone gallery.
Most installers already have a survey sheet. Far fewer have a workflow. The difference shows up downstream: the designer guesses the parapet height, the quote is revised twice, the installation crew finds a water tank where the panels were meant to go, and the customer starts to wonder whether the company knows what it is doing. A workflow puts a checkpoint between each team so that these problems are caught on the day of the survey, not on the day of installation.
Checklist or workflow: which one do you need?
You need both, and the checklist comes first. A checklist answers "what should the surveyor look at". A workflow answers "who does what next, by when, and what must be filled in before the record moves". A long checklist without a workflow still leaves records half done, because nobody is responsible for reading them before they reach design.
Which stages should a solar site survey workflow have?
Eight stages work for most rooftop and small commercial installers in India. Rename them to suit your team, merge two if your volumes are small, but keep the review stage: it is the one that saves the most rework.
- Survey request and bookingCapture the request with the customer's name, phone, site address with a map pin, the type of building and the reason for interest, such as bill savings, backup or a scheme application. Offer a slot, confirm it on WhatsApp or SMS, and ask the customer to keep the latest electricity bill and terrace access ready.Owner: sales or the telecaller desk
- Desk pre-checkBefore anyone travels, read the bill: consumer number, tariff category, sanctioned load and recent monthly units. Look at the roof on a satellite map to estimate the usable area and orientation. If the sanctioned load is too low for the size the customer wants, flag it now, because a load change is a separate request to the DISCOM.Owner: survey coordinator
- Visit preparationAssign the surveyor, share the pre-check notes and the map pin, and attach the right form for the site type. Confirm the tools: measuring tape or laser meter, compass or phone compass, inclinometer for sheds, a shade tool or app, and a charged phone with storage free.Owner: survey coordinator
- On-site captureMeasure each roof section and obstruction, note the structure and its condition, walk the shade sources at the site, trace the cable path from the array to the inverter and the meter, and photograph everything on the shot list. Ask the customer where they want the inverter and whether any terrace use must stay free.Owner: surveyor
- Same-day quality reviewA senior person opens the record the same evening and checks the required fields and photos. If anything is missing, the record goes back with a note, while the surveyor can still call the customer or return on the way to the next job.Owner: survey reviewer or design lead
- Design hand-offAn approved record moves to the designer with a status change, not a forwarded chat. The designer prepares the layout, string plan and material list, and logs any question against the record so the answer stays with the site.Owner: designer
- Quote and proposalSales prepares the quotation from the approved design, not from the surveyor's first estimate. If the design changed the system size, the proposal says why, using the survey photos, which helps the customer trust the number.Owner: sales
- Close the loopWhen the order is won, the survey record travels with the project to the installation crew. When it is lost, record the reason. When the site changes or the quote ages, trigger a re-survey instead of reusing old measurements.Owner: sales, then project lead
Stages 2 and 5 are the two that most small installers skip, and they are the cheapest to add. A short look at the bill and a satellite map before the visit, and a short review after it, remove most of the call-backs that slow quotes down.
What should a solar site survey record include?
A survey record should hold enough for three readers: the designer drawing the layout, the person filing papers with the DISCOM, and the crew lead planning the installation. Group the fields by those readers and mark the ones that must be filled before the record can move.
| Group | Fields to capture | Who reads it | Make required? |
|---|---|---|---|
| Account and bill | Consumer number, account holder name, tariff category, sanctioned load, monthly units for recent months, connection phase | Designer, liaison desk | Yes, all |
| Property and access | Building type, floors, terrace access route, ladder or stair needs, lift availability, who holds the key, society permission if shared | Crew lead | Building type and access |
| Roof and structure | Roof type (RCC, metal sheet, tiled, asbestos), dimensions of each usable section, slope and direction, parapet height, visible cracks or leakage, waterproofing age | Designer, structure team | Yes, all |
| Obstructions and shade | Water tanks, staircase rooms, dish antennas, nearby buildings and trees with height and distance, shade seen at visit time, seasons when shade is worse | Designer | At least one shade note per section |
| Electrical | Meter location and type, main switch and distribution board rating, spare ways, earthing condition, preferred inverter location, cable route and approximate length | Designer, crew lead | Meter, board and cable route |
| Customer intent | Goal (savings, backup, export), battery interest, budget comfort, finance need, scheme interest, decision maker | Sales | Goal and decision maker |
| Surveyor's verdict | Suitable, suitable with changes, or not suitable; reason in one line; recommended next step | Reviewer, sales | Yes |
A planning list for your own form. Your design tool and DISCOM may need more; add those fields rather than removing these.
Keep observations and conclusions apart. "Parapet 0.9 m on the south side" is an observation; "panels must be raised" is a conclusion the designer should draw. When surveyors write conclusions only, the designer cannot check them, and the record loses its value the moment the person who wrote it leaves.
How does the survey change for different kinds of sites?
The eight stages stay the same; the form attached at stage 3 changes. Pick the site type when the request is booked so the surveyor carries the right list.
Independent house terrace
The most common rooftop job and the one with the most clutter: tanks, staircase heads, clothes lines and future floor plans. Ask whether the family plans to build another floor, because that changes everything.
- Bill and load
- Terrace sketch
- Shade walk
- Inverter spot
- Customer sign-off
Software for rooftop installersResidential solar EPC software
- Extra fieldsFuture construction plans, terrace use to keep free, mounting height wish
- PhotosEvery tank and staircase head from two sides
- Watch forAccount name on the bill not matching the owner of the house
Apartment or society
The roof is shared, so the survey has a second customer: the association. Common-area load, lift and pump meters, and the committee's rules on terrace use decide what is possible.
- Committee contact
- Common meters
- Shared roof plan
- Access rules
- Resolution needed
- Extra fieldsNumber of meters involved, association contact, approval status
- PhotosCommon meter room and the whole terrace from each corner
- Watch forWork starting before the association has recorded its consent
Factory or warehouse shed
Metal sheet and asbestos roofs bring structure questions first: purlin spacing, sheet profile, corrosion and the roof's age. Daytime load from the plant usually matters more than export.
- HT or LT check
- Purlin survey
- Sheet condition
- Load profile
- Safety plan
- Extra fieldsSheet profile and thickness, purlin spacing, skylights, roof slope, walkway need
- PhotosUnderside of the roof, every skylight row, the HT or LT panel room
- Watch forAsbestos sheets: record them and hand off to the structure and safety lead
Ground or farm plot
No roof, but more to record on the land: soil, slope, drainage, boundary, distance to the grid point and how a crew and a vehicle will reach it.
- Land papers
- Plot boundary
- Soil and slope
- Grid distance
- Access road
- Extra fieldsSoil type seen, water logging history, fencing need, distance to the pole or substation
- PhotosPlot from each boundary and the route to the grid point
- Watch forA land owner who is not the electricity account holder
Which photos should a solar site survey capture?
Photos are the cheapest evidence a survey can produce, and the most common reason for a second visit is a photo nobody took. Give surveyors a fixed shot list, in the order they will walk the site, and make the form refuse to submit until each required shot is attached.
| Shot | What it must show | Used by |
|---|---|---|
| Building front | The whole building with the house number or gate visible | Crew lead, liaison desk |
| Electricity meter | Meter face with the number readable, and the meter board around it | Designer, liaison desk |
| Distribution board | Board open, breaker ratings readable, spare ways visible | Designer |
| Earthing point | Existing earth pit or strip, or the spot proposed for a new one | Designer, crew lead |
| Access route | Staircase or ladder point used to reach the roof | Crew lead |
| Roof, four corners | From each corner looking across, so the whole surface is covered | Designer |
| Each obstruction | Tanks, staircase heads, antennas, with a tape or a known object for scale | Designer |
| Shade sources | Neighbouring buildings and trees, facing south, east and west | Designer |
| Roof surface close-up | Cracks, leakage marks or sheet corrosion | Structure team |
| Inverter location | The wall the customer agreed, with the space around it | Crew lead |
| Cable path | Route from the roof edge down to the inverter and meter | Designer, crew lead |
Ask for geo-tagged, time-stamped photos taken inside the form rather than uploaded from the gallery. That proves the photo came from this site on this day, and it keeps customer photos off personal phones and chat groups.
How should a surveyor record shade?
Record the shade source, not only the shadow. A shadow seen at eleven in the morning in one month tells you little about December mornings, when the sun sits lower in the southern sky across most of India. A tree's height and distance, or a neighbour's building height and direction, lets the designer model shade across the year.
A simple method works on most homes. For each shade source, note its direction from the array area, its rough height above the roof and its distance. Photograph it facing that direction. If you use a shade tool or a sun-path app, attach its export to the record. Ask the customer two questions: has a neighbour applied to build higher, and are any trees likely to be cut or to grow? Their answers belong in the record because they change the design.
On sheds, look for shade from the plant itself: chimneys, ducting, cooling towers and taller bays. On ground plots, check the horizon on the south side for hills, rows of trees or future construction on the next plot.
Who owns each hand-off in the survey workflow?
Each stage needs one named owner and a clear "done" condition. Shared ownership is how a record waits three days with nobody noticing. The table below is a starting point for a small team; larger teams split the coordinator and reviewer roles across offices.
| Stage | Owner | Done when | Hands to |
|---|---|---|---|
| Request and booking | Sales | Slot confirmed, bill photo received, map pin set | Survey coordinator |
| Desk pre-check | Survey coordinator | Load, category and roof area noted; red flags marked | Surveyor |
| Visit preparation | Survey coordinator | Surveyor assigned with the right form for the site type | Surveyor |
| On-site capture | Surveyor | All required fields and shots attached; verdict given | Reviewer |
| Quality review | Reviewer | Record approved, or returned with a reason | Designer, or back to the surveyor |
| Design | Designer | Layout, system size and material list approved | Sales |
| Quote | Sales | Proposal sent and logged against the survey | Project lead, on order |
Measure the time between stages, not only the total. If records wait longest between capture and review, add a reviewer. If they wait between design and quote, the problem is in sales follow-up, and no change to the survey form will fix it.
What does a missing survey detail cost further down the line?
Each gap in a survey shows up later as someone else's delay. Tick the details your surveys often miss, and see which teams end up waiting.
Who waits
- Designer0
- Sales and quote0
- DISCOM liaison0
- Installation crew0
Tick a detail to see which teams are held up by it.
A thinking aid, not a score. It shows dependencies only; the real delay depends on your team.
Which survey workflow mistakes cause the most rework?
Most rework traces back to process, not to a careless surveyor. These five patterns come up again and again in installer teams of every size.
The survey lives in a chat group
Photos sent to a WhatsApp group are hard to find a week later, carry no site reference and leave with the phone. Capture them in a form tied to the customer's record, and use chat only for the notification that the record is ready.
Nobody reviews before design
Without a review step, the designer becomes the reviewer, usually days later and far from the site. A same-day check by someone senior catches a missing meter photo while the surveyor is still in the area.
The quote is made from the surveyor's guess
Surveyors often give the customer a rough system size on the roof. If sales quotes that number before design, the later revision feels like a price change. Quote only from the approved design, and train surveyors to say a size is indicative.
Old surveys are reused
A survey from months ago may miss a new tank, a neighbour's extra floor or a changed sanctioned load. Set an age after which a quote revision triggers a fresh visit or at least a phone check with new photos.
One form for every site
A terrace form on a factory shed skips purlins and sheet condition; a shed form on a house wastes the surveyor's time. Attach the form by site type at booking so the list fits the roof.
Can Zoho run a solar site survey workflow?
Yes. Zoho CRM holds the enquiry and the survey stage, Zoho FSM or a Zoho Creator mobile form captures the fields and photos on site, and Zoho WorkDrive keeps the files with each customer. Review, design hand-off and the quote then move as status changes on the same record. Shade modelling and layout design stay in your design tool; Zoho stores its output against the site.
| Need | Zoho app | How | Notes |
|---|---|---|---|
| Enquiry, booking and survey stage | Zoho CRM | Configuration | Deal stages or a survey module with your stage names |
| Surveyor assignment and slot | Zoho FSM | Configuration | Work order per survey with the map pin and site type |
| On-site form with required fields and photos | Zoho FSM, or a Creator form | Custom | Form by site type; offline capture for poor signal on roofs |
| Same-day review and return with a reason | Zoho CRM blueprint | Configuration | Approve or send back; the reason is mandatory |
| Reminders when a record waits | Zoho CRM | Native | Workflow rules and tasks on stage age |
| Photo and drawing storage per site | Zoho WorkDrive | Configuration | Folder template created with each survey |
| Layout and shade study from a design tool | Zoho CRM, or a Creator app | Custom | File attach, or an API link where the design tool offers one |
| Booking confirmations on WhatsApp | Zoho CRM plus a WhatsApp add-on | Marketplace | Needs a WhatsApp Business provider and approved templates |
| Survey-to-quote time by surveyor and office | Zoho Analytics | Configuration | Reports on days spent at each stage |
For the software side, including the survey app and how it feeds the quote, read our page on solar site survey software. App by app, see Zoho FSM for solar field teams, Zoho CRM for solar sales and custom solar apps on Zoho Creator. When the survey is done, the next step is a solar quotation built from the approved design.
Free survey workflow checklist
Is your survey workflow ready for more enquiries?
Tick each item your team does not do yet. Send the list to our solar expert before your meeting, or copy it for your own review.
How does Elite Tech Corp help installers set up survey workflows?
We map your current survey route with your survey lead, then set up the stages, forms, photo rules, review step and quote hand-off on Zoho so they match how your team actually works. We have delivered many solar projects, and we offer three options; we recommend the option that fits your business after we have looked at a few of your recent surveys.
Zoho Solar, for survey stages on standard apps
Survey stages, assignment, reminders and file storage set up on standard Zoho apps.
- CRM, FSM, WorkDrive, Analytics
- Suits teams starting from paper or chat
Zoho Solar + Custom, with survey forms per site type
Zoho apps plus custom survey forms by site type, a review screen and links to your design tool.
- Custom parts written in Deluge on Creator
- Suits teams with several surveyors and offices
Complete end-to-end solar product, from survey through AMC
Our complete solar business product, where the survey feeds design, quote, project, installation, service and AMC in one system.
- One record from enquiry to after-sales
- Suits installers growing into full EPC work
We build the software, not the survey itself: your engineers still judge structure, safety and design. To see every solar workflow we support, visit the solar industry software hub, or read how solar EPC software connects survey, design and execution for larger projects.
Want surveys that reach design complete, the first time?Share one recent survey with us and we reply within 1 business hour.
Book your meeting with our solar expert todayClient voices
How do clients describe our Zoho delivery?
These quotes come from Elite Tech Corp clients in other industries. The stages, field lists and shot lists in this guide are general guidance.
The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
Who wrote this survey guide, and what should you check locally?
Elite Tech Corp wrote this guide and our Zoho team reviewed it as a process guide for solar installers and EPCs in India. It describes how to organise survey work, not how to judge a structure or design a plant: those calls belong to your qualified engineers. Document lists and load rules for a grid connection come from your DISCOM and your state's regulations; rules change; check the official portal of your DISCOM before you rely on any field list. For scheme households, our PM Surya Ghar vendor process guide explains the vendor side.
FAQ
Questions about the solar site survey workflow
Show us how a survey moves through your team today, and we will point out where records stall.
Book your meeting with our solar expert todayWhat should a solar site survey include?
A rooftop survey should record the electricity account details from the bill, the building and access, each usable roof section with its size, slope and condition, obstructions and shade sources with height and distance, the meter, distribution board, earthing and cable route, the customer's goals, a fixed set of photos and the surveyor's verdict on suitability.
What are the steps in a solar site survey workflow?
A practical workflow has eight stages: survey request and booking, a desk pre-check of the bill and a satellite view, visit preparation, on-site capture, a same-day quality review, hand-off to design, the quote built from the approved design, and closing the loop with the installation team or a lost reason.
How long does a rooftop solar site survey take?
A house terrace is usually the quickest, especially when the surveyor arrives with the bill details and a satellite view already checked. Large sheds and ground plots take longer because structure and land details need more measurement. Plan the desk check and review time too, not only the visit.
Can a solar site survey be done remotely?
Partly. Satellite maps, the electricity bill and customer photos let you estimate roof area, orientation and system size before the visit. Structure condition, exact obstruction heights, the distribution board and the cable route still need someone on site, so treat a remote survey as preparation rather than a replacement.
Why do solar quotes change after the site survey?
Usually because the first number came from a rough estimate and the design found less usable area, more shade, a longer cable route or electrical work the estimate missed. Quoting only from the approved design, and telling customers that on-roof sizes are indicative, keeps revisions rare.
Who should review a solar site survey before design?
A senior surveyor or the design lead should check each record the same day for required fields and photos, then approve it or return it with a written reason. That catches gaps while the surveyor can still call the customer or revisit nearby.
Should every solar site survey use the same form?
No. Keep the same stages for every survey but attach a form that fits the site type: house terrace, apartment or society, factory or warehouse shed, or ground plot. Each brings its own fields, such as association consent, purlin spacing or soil and grid distance.
Can Zoho manage solar site surveys?
Yes. Zoho CRM tracks the enquiry and survey stages, Zoho FSM or a Zoho Creator form captures fields and photos on site, Zoho WorkDrive stores files per customer and Zoho Analytics reports on survey-to-quote time. Layout design and shade modelling stay in your design tool, with its output saved on the record.