Book a Meeting

Rotary isolators · fused disconnects · string isolator enclosures

Solar DC isolator manufacturer ERP and CRM, from contact lot to OEM dispatch

A solar DC isolator manufacturer ERP keeps every rating, pole count and enclosure variant of your disconnect switches on one record, with the contact and housing lots inside each batch and the dielectric test that cleared it. We set it up on Zoho for Indian makers of rotary DC isolators, fused DC disconnects and string isolator boxes, then add Zoho CRM for inverter OEMs, combiner box builders, EPC buyers and distributors. Screens Zoho does not offer as standard, such as a hi-pot result log, we build in Zoho Creator and name in the scope.

  • Zoho Advanced Partner
  • 300+ projects delivered
  • Standard Zoho, custom build and test bench kept apart

We reply within 1 business hour · No obligation

Lot AGC-0218 · silver contactsInward check passed · Sample
DCI-32-4P batch 44 · 240 unitsHi-pot log complete · Sample
One handle, four poles, one traceable batch
300+
Zoho and custom builds handed over to clients
2021
The year our first Zoho build went live
3 offices
Head office in Coimbatore, plus Kochi and Bengaluru
ZohoAdvancedPartner

Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner

Where isolator plants lose time

Why do DC isolator makers outgrow Tally and spreadsheets?

Because one switch design quickly becomes dozens of saleable codes. Voltage, current, pole count, enclosure, gland size and private-label artwork multiply, and a sheet cannot keep each code tied to its parts, its test and its buyer.

VariantsWhich code did the OEM actually order?

A 1000 V 32 A four-pole unit with M25 glands and a lockable handle is a different item from the same switch with M20 glands. Wrong picks show up only at the buyer's dock.

ContactsWhich silver-plated lot went into the returned switch?

Contact bridges, springs and terminals arrive in lots. Without a link from batch to lot, a field complaint turns into a search through supplier invoices.

MouldingHow many good housings did the press really give?

Housings, rotors and handles come off in-house presses or a job moulder. Short shots and flash are scrapped on the floor and never reach the cost sheet.

TestingWhere is the dielectric result for unit 118?

Hi-pot and contact resistance readings sit in a register beside the bench. A buyer audit asks for them by serial, and someone spends an afternoon scanning pages.

BuyersWho follows up the inverter OEM's sample approval?

OEM qualification runs for weeks: samples, drawings, a trial order. It lives in one salesperson's inbox, so a promising account goes quiet.

ChannelWhat price did your largest distributor get last quarter?

Distributor slabs, OEM contract prices and EPC project rates differ for the same code. Quotes made from memory leak margin one order at a time.

Who it fits

Which kind of DC disconnect business is this setup for?

Any Indian plant that assembles or makes DC switching parts for solar strings and sells them on to people who build larger systems. Four profiles cover most of them; pick the one that sounds like your shop floor.

Kit assemblers

You buy switch mechanisms and enclosures, assemble, test and pack under your brand. The work is a tight BOM per code, clean lot entry at the gate and a test record per carton.

Starts withZoho Inventory assemblies and Zoho Books

Moulding plus assembly plants

You run presses for housings, rotors and handles, then assemble contacts and decks yourselves. Resin issue, regrind and press scrap need their own records.

Starts withTwo-stage BOM, a Creator press log

OEM suppliers

Most output goes to inverter, combiner box or DCDB makers on scheduled orders with their part numbers and drawings. Delivery schedules and buyer-specific labels drive the plan.

Starts withZoho CRM accounts, buyer part-number mapping

Brands selling through dealers

Your isolators reach installers through distributors and electrical shops. Scheme pricing, stock at each distributor and warranty swaps matter as much as the factory.

Starts withZoho CRM, price lists, Zoho Desk

Also make combiner boxes or full DC distribution boards? Then the isolator becomes a part in a bigger BOM, and our balance-of-system manufacturer page covers that wider assembly.

The making of one isolator batch

How does a solar DC isolator get made, and where does Zoho hold each record?

In six stages, from a buyer's drawing to a carton at the OEM's gate. The rail on the left tracks the stage you are reading; each scene names the Zoho app or custom app that keeps its record. Every code and number shown is Sample.

  1. Rating and order
  2. Contacts and resin inward
  3. Moulding
  4. Deck and enclosure assembly
  5. Routine tests
  6. Label, pack and ship

Stage 1 · Rating and order

The order names a rating, not just a product

An inverter OEM sends a schedule against its own part numbers; a distributor orders by your catalogue code; an EPC buyer asks for a quote on a project quantity. Each line resolves to one item code that carries voltage, current, poles and enclosure, so planning starts from the exact switch rather than a description.

  • Zoho CRM
  • Zoho Inventory

Stage 2 · Contacts and resin inward

Small parts arrive in large lots, and each lot needs a number

Silver-plated contact bridges, snap-action springs, brass terminals, gaskets, screws and bags of UV-stabilised resin come in from different suppliers. Every receipt gets a lot number and sits in a hold location until stores and quality sign it off; a rejected lot becomes a vendor return with its debit note.

  • Zoho Inventory
  • Zoho Books
  • Zoho Creator (custom)

Stage 3 · Moulding

Housings, rotors and handles come off the press

A moulding order issues resin by lot and records good parts, rejected shots and regrind per shift and per tool. If a job moulder does this step, the resin sent out stays your stock at their location until the parts return on a challan. Either way the moulded parts enter stores as their own items, ready for assembly.

  • Zoho Inventory
  • Zoho Creator (custom)

Stage 4 · Deck and enclosure assembly

Contact decks stack up to the pole count, then go into the box

The work order issues contact bridges, springs and terminals by lot, plus the moulded rotor and housing. Operators build each deck, stack two or four of them on the shaft, fit the handle and close the enclosure with its gasket and glands. A tablet form records output, rework and the terminal torque check for the shift.

  • Zoho Inventory
  • Zoho Creator (custom)

Stage 5 · Routine tests

Every switch is operated and stressed before it can ship

Routine checks on an isolator line usually cover a dielectric withstand test, contact resistance across each pole, a set of on-off operations and a visual check of markings. The bench keeps its own readings. What lands in Zoho is the pass or fail per unit or per batch, imported from the bench file into a Creator test log, and a failed unit goes to a rework location with its reason.

  • Zoho Creator (custom)
  • Bench file import

Stage 6 · Label, pack and ship

The carton carries the rating, the batch and, if asked, the buyer's part number

Passing units get a rating label and a batch or serial number, are packed by carton and scanned onto the shipment. The invoice leaves with e-invoice and e-way bill details from Zoho Books, and the batch list travels with it. Months later, a warranty claim from an installer opens that batch and shows its contact lots, moulding order and test log.

  • Zoho Inventory
  • Zoho Books
  • Zoho Desk

The batch above is an illustrative flow with simplified details; real client work stays confidential.

Item master

How should DC isolator variants be coded in an ERP?

Keep one base design per switch family and record each rating choice as an attribute, so the saleable code is built from a short list of fields instead of typed by hand. That keeps the item list readable and lets one BOM serve many variants.

  • Rated DC voltage, rated current and pole count as attributes, not free text
  • Enclosure material, ingress rating and gland size as variant fields
  • The buyer's own part number mapped to your code, per buyer
  • Private-label artwork as a packing option, not a separate product
  • Certificate number and validity held on the family, for your quality team
Item DCI-32-4P-M25-L Sample
FamilyRotary DC isolator, enclosed
Rated voltage1000 V DC
Rated current32 A
Poles4 (two strings)
EnclosureUV-stabilised polycarbonate
GlandsM25, four entries
HandleLockable in off position
Buyer part numbers2 mapped
TrackingBatch, with serial on request
BOM revisionC, approved by engineering

Technical boundary

What does Zoho handle natively for an isolator plant, and what needs a custom build?

Zoho runs items, stock, purchase, sales, accounts, buyers and service out of the box. It does not run your presses or your test bench, and it has no built-in hi-pot log or press shot counter. Those records we build in Zoho Creator; the machines keep their own controllers.

Standard Zoho, configured by us

  • Item groups with rating attributes and variants
  • Assemblies and BOMs for decks, switch blocks and boxes
  • Batch tracking on contacts, springs and resin
  • Hold, job-moulder and finished-goods locations
  • Supplier POs, bills and debit notes for rejected lots
  • Invoices that carry the IRN and e-way bill number for each dispatch
  • OEM, distributor and EPC accounts, quotes and price lists
  • Warranty tickets in Zoho Desk

Isolator screens we add in Creator

  • Press log: shots, good parts, rejects and regrind per tool
  • Assembly shift log with torque checks and rework
  • Routine test log imported from bench files
  • OEM sample and qualification tracker with drawing revisions
  • Distributor ordering portal with your scheme rules
  • Batch cost roll-up including press scrap

Stays with your machines and labs

  • Moulding machine settings and tool data
  • Raw waveforms and readings on the test bench
  • Type tests and endurance tests at a lab
  • Product design files and drawings in CAD
  • Certification decisions by the certifying body

On standards and approvals: your product's type tests, its certification and any license your buyers ask for are handled by your quality team with the lab and the certifying body. The system can store certificate numbers, test report references and validity dates on each switch family and remind you before they lapse. It does not certify, file or approve anything, and the rules change, so check the official portal for the current position.

Choose how to build it

Zoho Solar, Zoho Solar + Custom, or our complete end-to-end solar product: which suits an isolator maker?

All three are on offer, and we recommend the option that fits your business after we have walked one batch with you. The table compares them on the jobs an isolator plant repeats every week, next to the Tally and Excel setup most plants start with.

Tally and Excel compared with the three Elite Tech Corp solar options for a DC isolator manufacturer
Plant job Tally and ExcelWhat many small switch makers run Zoho SolarConfigured Zoho apps, no custom code Zoho Solar + CustomZoho apps with custom screens, portals and linksCommon for plants with presses Complete end-to-end solar productETC's own product for the whole solar chain
Rating variants under one base designOne row per codeItem groupsItem groupsIncluded
Contact and spring lots traced to each batchNot linkedZoho InventoryZoho InventoryIncluded
Press shots, rejects and regrindFloor registerNot nativeCreator press logIncluded where scoped
Hi-pot and contact resistance per unitPaperCustom fields onlyCreator test logIncluded
OEM sample and approval follow-upInboxZoho CRMZoho CRM with drawing trackerIncluded
Distributor orders and scheme pricesPhone and WhatsAppPrice lists in ZohoCustom distributor portalIncluded
Tax invoice, IRN and e-way bill at dispatchTallyZoho BooksZoho BooksIncluded
Warranty swap against a batchEmailZoho DeskZoho Desk with batch lookupIncluded

A kit assembler with a handful of codes often does well on Zoho Solar alone. A plant that moulds its own housings and tests every unit usually needs the custom pieces. We write down the choice and the reasons before any build starts.

By product line

How does the setup differ across DC disconnect product lines?

The six making stages stay the same; the BOM depth, the tests and the buyers change. These are illustrative setups for five common isolator and disconnect lines.

Enclosed rooftop DC isolators

The switch block in a weatherproof box with glands and a lockable handle, sold to installers and EPC firms for residential and commercial roofs. High volume, many enclosure variants and a lot of distributor sales.

  1. Box and gland inward
  2. Switch block build
  3. Enclosure fit and seal
  4. Routine test
  5. Carton and dispatch

Distributor orders and channel stock

  • Usually fitsZoho Inventory, Books, CRM and a Creator test log
  • Key setupEnclosure and gland as variant fields, batch per work order
  • Watch forSeparate item codes for every gland and colour mix

CRM for isolator sales

How do isolator makers sell, and what should the CRM track for each buyer type?

Isolator makers sell through three very different doors: OEM qualification, distributor schemes and EPC project quotes. Zoho CRM keeps each door as its own pipeline, so the factory sees what is coming and sales sees what is in stock.

Inverter and BOS OEMs

Long qualification, then steady call-offs. Track sample dispatch, drawing approvals, trial orders and the agreed contract price per part number, with reminders when a schedule is due.

Zoho CRM + Creator sample tracker

Distributors and electrical dealers

Repeat orders across your catalogue. Track slab prices, scheme periods, credit limits and stock they hold, and let them reorder through a portal instead of a call.

Zoho CRM + Books + custom portal

EPC contractors and tenders

One project, a large quantity, a deadline and often an inspection. Track the quote revision, the spec sheet sent, the inspection date and phased deliveries against the project.

Zoho CRM with project reservations in Inventory

Running a dealer network across states? Our pages on dealer portals for solar brands and solar dealer management go deeper into scheme claims and channel stock.

Automations

Which isolator plant tasks can run on their own?

Six triggers we often set up for DC switch makers. You decide the limits and who gets told; we build the rule and test it on a pilot batch.

  • WhenAn OEM schedule needs more contact bridges than stock and open POs holdPurchasing gets the shortfall by supplier with the call-off date.Zoho Inventory
  • WhenA spring or contact lot fails its inward checkIt stays on hold, a vendor return is drafted and the supplier's score drops.Creator inward check, Inventory hold location
  • WhenPress rejects on a tool cross your limit in a shiftThe production head is alerted with the tool and the resin lot.Zoho Creator
  • WhenA unit fails the dielectric testIt moves to rework and the batch cannot be packed until it is closed.Zoho Creator
  • WhenA certificate on a switch family is 60 days from expiryQuality and sales both get a reminder with the families affected.Zoho Creator
  • WhenAn installer logs a warranty claim with a batch numberThe ticket shows the contact lots and test log, and flags other buyers who got that batch.Zoho Desk with a Creator batch lookup

License cost

What do the Zoho licenses cost for a DC isolator plant?

The license bill depends mostly on who logs in. Zoho Inventory and Zoho Books are priced per organisation; Zoho Books Standard is ₹749 a month billed yearly, plus GST. Press and test-bench operators on Creator forms count as Creator users. Choose a plan and a user count below for a figure at Zoho's India list rates.

  • Estimate only: the license invoice comes from Zoho, not from us
  • A sales team on CRM and a floor team on Creator are priced separately
  • Our setup and custom work is a fixed fee set out in the scope you sign

Connections

What does an isolator maker's Zoho setup connect to?

Data moves between the Zoho apps without any connector. Test benches, label printers and press counters connect through export files or an API, and we check each device before we quote. Every line below says whether it is native, marketplace or custom.

Across Zoho

One order from buyer to books

  • Zoho CRM to Zoho Inventory for OEM schedules and distributor orders Native
  • Zoho Inventory into Zoho Books so supplier bills, sales invoices and stock value agree Native
  • Zoho Desk to Zoho CRM for warranty claims against the buyer account Native

On the floor

Readings reach the batch without retyping

  • Hi-pot and contact resistance benches through their export files into a Creator log Custom
  • Barcode and rating label printers for batch and serial labels Custom
  • Press shot counters where the machine offers an export or API Custom

Money and documents

Dispatch and accounts stay level

  • E-invoice (IRN) and e-way bill data on Zoho Books invoices for Indian GST Native
  • Tally masters and balances moved over, or Tally kept read-only during the switch Custom
  • Payment gateways supported by Zoho Books, for distributor collections Marketplace

Rollout

How does an isolator plant switch to Zoho while the line keeps running?

Stores first, then the floor, then tests and dispatch, one batch at a time. The order of steps is set; the dates go into the signed scope, because a kit assembler and a moulding plant need very different plans.

  1. 1Trace one batchFrom buyer order to dispatched carton with your production head, stores and quality lead.
  2. 2Pick the optionZoho Solar, Zoho Solar + Custom or the complete product, with each custom screen listed.
  3. 3Codes and BOMsRating attributes agreed, variants loaded, BOM revisions checked by engineering.
  4. 4Stores go liveLot entry, inward hold and issue to work orders, while assembly carries on as before.
  5. 5Floor and benchPress and assembly logs, bench imports and labels proved on a pilot batch.
  6. 6Train and reviewFloor, stores, sales and accounts staff trained in English, Hindi, Marathi, Tamil, Kannada or Malayalam, with a review after the first month-end.

Free requirements checklist

What does your isolator plant need from its ERP first?

These twelve come up in nearly every conversation with DC switch makers. Ticked items drop straight into the enquiry form below, so the meeting opens with your list on the table instead of a blank page.

0 of 12 isolator needs ticked

Codes and BOM
Stores and moulding
Tests and trace
Sales and service

Where we meet

Where can an isolator manufacturer meet our team?

At your plant when watching the assembly bench helps, at our Bengaluru office by appointment, or on video for plants anywhere in India. Floor training works well on site at shift change.

Vasanth Nagar, Bengaluru

Find our Bengaluru office at #39, 8th Main Road in Vasanth Nagar (560052). Meetings are by appointment with the Bangalore Zoho partner team.

Electrical belts around Bengaluru

Plant visits in Peenya, Bommasandra, Jigani, Bidadi and Doddaballapur, when your plant is in the Bengaluru region.

Southern plants

For plants in Tamil Nadu or Kerala, our Coimbatore head office and Kochi branch are nearer.

Languages on the floor

Operators, stores, quality and accounts teams trained in English, Hindi, Marathi, Tamil, Kannada and Malayalam.

Making isolators in another state?

A video session covers the batch walk-through; a site visit can follow for the pilot run. Ask for a video walk-through

Client feedback

Which words have Zoho clients used about our delivery?

We have delivered many solar projects, and this page keeps to Sample data throughout. The quotes below are published feedback from Zoho clients in other industries, and the isolator flows on this page are illustrative with Sample data.

The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
KVP EnterprisesFounder and CEO · manufacturing automation
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
MegawinFounder and CEO · multiple Zoho applications
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
F Care GroupFounder and CEO · Zoho Books, APIs, workflows
TrukkingLulu HolidaysMegawinJADKingsSygaardJemkonBrealantRockolyLendonRohealthTengani

FAQ

DC isolator manufacturer ERP: questions plant heads ask

Bring your production head and your quality lead to the first meeting. Questions not answered here? Write in through the form, or book your meeting with our solar expert today and ask in person.

What is a solar DC isolator manufacturer ERP?

It is the business system an isolator or DC disconnect plant uses to code its rating variants, buy and store contacts, springs and resin by lot, run moulding and assembly work orders, record routine test results, ship to OEMs and distributors and see the cost of each batch. On Zoho it combines Zoho Inventory, Zoho Books and Zoho CRM, with custom Zoho Creator apps for press and test logs.

Can Zoho handle the many voltage, current and pole variants of a DC isolator?

Yes. Zoho Inventory item groups hold one base design with attributes such as rated voltage, rated current, poles, enclosure and gland size, and each combination becomes its own stock code. One BOM can then serve the family, with the variant parts swapped in per code.

Can we trace a returned isolator back to its contact and spring lots?

Yes, through batch tracking. Contacts, springs, terminals and resin are received by lot, issued by lot to the work order, and the finished batch keeps that link. A warranty ticket that names the batch shows which lots went in and which other buyers received the same batch.

Does Zoho record hi-pot and contact resistance test results?

Zoho has no ready-made screen for that. We build a test log in Zoho Creator that imports the pass or fail and key readings from your bench's export file against each unit or batch. The bench keeps its full raw data, and a failed unit is moved to rework automatically.

Can the same setup manage OEM, distributor and EPC sales?

Yes. Zoho CRM runs a separate pipeline for each: OEM qualification with samples and drawing approvals, distributor orders with slab prices and schemes, and EPC project quotes with inspection dates. Orders flow into Zoho Inventory so the plant plans against confirmed demand.

Does the ERP make our isolators certified or approved?

No. Certification, type tests and any license your buyers ask for are handled by your quality team with the lab and the certifying body. The system stores certificate numbers, report references and validity dates and reminds you before they lapse. Rules change, so check the official portal for the current position.

Which option should an isolator maker choose: Zoho Solar, Zoho Solar + Custom or the complete product?

It depends on whether you mould your own parts, how many codes you sell and how you test. A kit assembler with a short catalogue often fits Zoho Solar; a plant with presses and unit-level tests usually needs Zoho Solar + Custom; a group that also builds combiner boxes and runs a dealer network may suit the complete end-to-end solar product. We recommend the option that fits your business and explain why in writing.

How much do the Zoho licenses cost for an isolator plant?

Zoho bills the licenses at its India list prices, plus GST. On yearly billing, Zoho Creator Standard runs ₹480 a user each month and Zoho Inventory Standard ₹999 an organisation each month. Our setup and custom work is a fixed fee set out in the scope you sign, after a free first meeting.

We use a job moulder for housings. Can the system follow resin sent out?

Yes. The job moulder becomes a stock location, so resin sent on a challan stays your stock there, and the moulded housings come back as received items against that challan. Rejects reported by the moulder can be booked against the lot.

Do you have solar industry experience?

Yes: we have delivered many solar projects, and every example on this isolator page uses Sample data so no client is exposed. At the first meeting our solar expert takes one of your own recent batches and maps each step to a Zoho app or a custom screen.

DC isolator plant review

Book your meeting with our solar expert today

Tell us which ratings you make, who buys them and what runs your stores and accounts today. We reply within 1 business hour. No obligation.

  • We trace one isolator from moulded housing to the OEM's goods receipt with your production head
  • You see what Zoho covers as standard, what we build and what stays with your test bench
  • Meet on video, at your plant, or at Vasanth Nagar in Bengaluru

Tell us about your business

Three short steps. Fields marked * are required.

Your need
Your company
How we reach you

Privacy notice. We collect the details in this form (name, business email, phone, company, city and your requirement) only to reply to your enquiry and arrange the assessment. They are stored in Zoho CRM, the system we use to manage enquiries, and are never sold or used for advertising. The updates box is optional and you can withdraw it at any time. To see, correct or delete your details, or to withdraw consent, call +91 89259 24785 or message us on WhatsApp. Read our privacy policy.