Solar fasteners manufacturer ERP and CRM, from wire rod heat to counted kit bag
A solar fasteners manufacturer ERP has to do three things a general accounting package cannot: follow every heat number of wire rod through heading, rolling and finishing, keep stock that is weighed in kilograms but sold in pieces, and ship mounting kits that an EPC crew can open on a rooftop without a missing nut. We set this up on Zoho for Indian makers of stainless and galvanised bolts, screws, washers and anchors used in solar structures, with Zoho CRM for EPC buyers, distributors and dealers. Where a step needs a screen Zoho does not ship, we build it in Zoho Creator and write that down before work starts.
12,400 pcs from 186 kgWeight-to-count at packing · Sample
Coil, header, roller, kit
300+
Zoho and custom software projects
2021
First Zoho rollout year
6 languages
Training in English, Hindi, Marathi, Tamil, Kannada and Malayalam
ZohoAdvancedPartner
Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner
Where the money leaks
Where does a solar fastener plant lose money without noticing?
Mostly in the gaps between kilograms and pieces, between the plant and the plating shop, and between a bolt and the heat it came from. Tap a card to see the record that closes each gap.
Who it fits
Which kind of fastener business is this page written for?
Makers and kit packers of the small hardware that holds solar structures together: stainless bolts for module clamps, J-bolts and anchors for roofs and foundations, hammer-head bolts for aluminium rail, and self-drilling screws for metal sheet roofs. Choose the card that sounds most like your floor.
You head and roll your own bolts
Cold headers and thread rollers on the floor, wire rod bought by the coil. Heat trace, scrap from setting and the cost per thousand pieces are where the system earns its keep.
Starts withZoho Inventory batches, a Creator shift log
You buy fasteners and pack solar kits
Bolts, nuts and washers bought from several makers, sorted and bagged into kits for EPC firms and installers. The work is kit lists, reorder levels and supplier certificates.
Starts withKit assemblies in Zoho Inventory, Zoho Books for GST
You make fasteners and structures together
The same plant cuts rail or channels and supplies the hardware for it. One EPC order then holds steel sections by weight and fasteners by count, and both have to leave on one truck.
Starts withMixed-unit items, project-wise orders in Zoho CRM
You sell to dealers as well as EPC firms
Rooftop installers buy small packs through dealers; EPC firms buy by the project. Two price lists, two credit rules and two ways of ordering share the same stock.
Starts withZoho CRM price books, a dealer order portal
The story of one heat number
How does a coil of wire rod become a kit on a rooftop?
Six stages, and the heat number has to survive all of them. Scroll the line: the rail tracks the stage, each scene names the Zoho app or custom app that keeps the record, and every number shown is Sample.
Coil and heat
Drawing and heading
Thread rolling
Finish and job work
Inspection
Count, kit and dispatch
Stage 1 · Coil and heat
A coil arrives, and its heat number becomes the lot number
The receipt records the supplier, grade, wire size, weight and the heat number printed on the mill certificate, which is scanned and attached. The coil sits in a quality-hold location until someone checks the certificate against the purchase order. Only then can the store issue it to a work order.
Zoho Inventory
Zoho Books
Stage 2 · Drawing and heading
The work order issues the coil and the header forms the blanks
A work order names the part, the quantity in pieces and the expected weight of wire. The store issues the coil by weight against it, which carries the heat number forward. At the header, operators log output, setting scrap and die changes per shift on a tablet form, so the gap between wire issued and blanks made is visible by the next morning.
Zoho Inventory
Zoho Creator (custom)
Stage 3 · Thread rolling
Blanks become bolts, and the first piece off the roller is checked
Rolling forms the thread on each blank. A first-off check with thread gauges and a length reading is logged before the batch runs, and patrol checks follow through the shift. If the gauge fails, the batch is stopped and tagged in the system, not just by a note on the bin.
Zoho Creator (custom)
Stage 4 · Finish and job work
Galvanising, plating or passivation, often outside the plant
Carbon steel bolts for ground-mount structures may go out for heat treatment and hot-dip galvanising; stainless parts may be passivated. Material at the job worker stays in your stock under their location. The return is booked by weight and count against the outward challan, and the finish batch number is added to the lot so it can be traced later.
Zoho Inventory
Zoho Books
Stage 5 · Inspection
Final inspection releases the lot, with the reports filed on it
Dimensions, thread, hardness, coating thickness or a salt spray result, depending on the part and what the buyer asked for. The inspection record lists the sample size, the readings and pass or fail, and the lab or in-house report is attached. A released lot moves to finished stock; a failed one goes to a rework or scrap location with the reason.
Zoho Creator (custom)
Zoho Inventory
Stage 6 · Count, kit and dispatch
Bolts are counted by weight, packed into kits and invoiced by lot
Loose parts are packed in bags or boxes of a fixed count, checked on a counting scale. Kits for one module table or one structure design are built from their parts list and weighed as a whole. The packing list carries every lot inside, the invoice goes out with its e-invoice and e-way bill details, and the certificates for those lots go to the buyer with it.
Zoho Inventory
Zoho Books
Zoho CRM
One EPC order, two ways
What changes for one 2,000-kit EPC order once the records connect?
The order is the same; the number of phone calls is not. Drag the handle to compare the same Sample order run on registers and spreadsheets with the same order run on Zoho.
Registers and Excel
Order daySales promises dispatch in ten days without knowing that the M8 nuts are short
Day 3Purchasing finds out from the packing team and buys at that week's rate
Day 7Plating returns are booked as one lump, so nobody notices 40 kg missing
DispatchThe site engineer asks for certificates and someone searches email for an hour
Month endThe margin on the order is a guess made after the books close
Zoho with a Creator plant app
Order dayThe kit list is exploded against stock and open work orders, and the nut shortfall shows at once
Day 1A purchase order for the shortfall goes out at the current rate
Day 7The plating return is checked against the challan by weight and count, lot by lot
DispatchCertificates for every lot on the packing list are attached to the invoice email
Month endMaterial, scrap and job-work cost sit against the order on a dashboard
This is an illustrative order with Sample quantities, simplified for the page; real client setups stay confidential.
Pick your build
Which of our three solar options suits a fastener manufacturer?
We offer Zoho Solar, Zoho Solar + Custom and a complete end-to-end solar product, and we recommend the option that fits your business after walking one order with you. The table sets them against the register-and-spreadsheet setup many fastener plants still run.
Registers and spreadsheets compared with three Elite Tech Corp solar options for a fastener manufacturer
Plant job
Registers and ExcelBin tags, challan books, sheets
Zoho SolarFastener flows set up on standard Zoho apps
Zoho Solar + CustomZoho apps plus custom apps, portals and integrationsUsual fit for heading plants
Complete end-to-end solar productOur own solar product, from coil to dealer
Heat number carried from coil to finished lot
Written on bin tags
Heat number held as a Zoho Inventory batch
Batch plus Creator work order link
Included
Stock in kilograms and pieces
Two sheets that disagree
Weight per piece as an item field
Counting-scale step in a Creator app
Included
Kits per module table or structure design
Printed pick lists
Kit as a Zoho Inventory composite item
Composite items plus a kit builder
Included
Shift output and setting scrap at headers and rollers
Paper register
Not native
Creator shift log
Included
Job-work challans checked by weight and count
Challan book
Job-work location and transfers
Transfers plus tolerance check
Included
Inspection records and test certificates per lot
Files on a shared drive
Attachments on the batch
Creator inspection app
Included
Tax invoice for a kit order, with IRN and e-way bill
Tally
Zoho Books
Zoho Books
Included
Dealer and EPC buyer ordering
Calls and WhatsApp
Zoho CRM quotes and orders
CRM plus a dealer portal
Included
A kit packer that buys every part in usually does well on Zoho Solar alone. A plant with its own headers, rollers and job workers tends to need the custom pieces. We give the choice and the reasons in writing.
Technical boundary
What does Zoho do natively for a fastener plant, and what needs a custom build?
Zoho handles items, batches, stock, purchase, sales, GST and buyers out of the box. It does not run your headers or rollers and it has no ready screen for shift logs, inspection plans or weight-to-count packing. Those are custom Creator apps, and machine data stays on the machines.
Out of the box in Zoho, set up for fasteners
Items by size, length, grade and finish, with batch tracking
Composite items for solar mounting kits
Warehouses and job-worker locations, with transfers
Coil purchase orders, supplier bills and debit notes for rejected heats
Price books for EPC buyers and dealers
GST invoicing for kits and loose parts, with IRN and e-way bill
Sales and stock dashboards
Fastener screens we build in Creator
Work orders that issue coil by weight and report pieces
Shift logs for headers and rollers with scrap reasons
First-off, patrol and final inspection records
Counting-scale and kit-weight checks at packing
Job-work tolerance check on returns
Dealer order portal with your credit rules
Stays outside Zoho
Header and roller controls and die settings
Lab equipment raw data, such as salt spray chamber logs
Product drawings and design files
Certification and approvals handled by your quality team
On grades and standards: the system records the grade, property class, finish and the standard your buyer names on each item and lot, and it holds your test reports. It does not certify a product or make a plant compliant with any standard; your quality lead owns that.
By product
How does the setup differ for each solar fastener family?
The six stages stay the same; the unit of sale, the finish and the checks change. These are illustrative setups for five fastener families used in solar structures.
Stainless hex bolts, nuts and washers for module clamps
The highest volume family: M6 to M12 stainless sets that hold clamps to rails. Small parts, many sizes, and buyers who check the grade marking on the head.
Usually fitsZoho Inventory, Books and a Creator job-work check
Key setupTwo job-work locations in sequence, coating thickness on each lot
Watch forZinc weight gain booked as free stock
Automations
Which fastener plant tasks can run on rules instead of reminders?
Six triggers fastener makers find useful. You set the limits and who is told; we build the rule and test it on a pilot batch.
WhenA confirmed kit order needs more of a size than stock and open work orders coverA shortfall line per part goes to planning with the quantity in pieces and kilograms.Inventory stock, Creator planning
WhenA coil is received without a mill certificateThe coil stays in quality hold and purchasing gets a task to chase the supplier.Zoho Inventory
WhenSetting scrap at a header passes the limit you set for a shiftThe shift supervisor and plant head see the work order and the die used.Zoho Creator
WhenA job-work return differs from the challan beyond toleranceThe return is held for review and the job worker's bill cannot be approved.Creator + Zoho Books
WhenA quote is older than its rate validity dateThe salesperson is asked to refresh the rate before the buyer confirms.Zoho CRM
WhenA dealer order would push the dealer past the credit limitThe order waits for approval and the dealer sees why on the portal.Zoho CRM with Books credit
License cost
What does Zoho licensing cost for a solar fastener plant?
Zoho Inventory and Zoho Books are priced per organisation, so a plant pays one fee for each however many store staff use them; Zoho Inventory Standard is ₹999 a month billed yearly, plus GST. Per-user apps such as Zoho Creator and Zoho CRM depend on how many people log in. Pick a plan to see an estimate at Zoho's India list prices.
Estimates only; Zoho invoices the licenses to your company
Shop-floor tablets on a Creator form need Creator users
Our setup work for your plant is quoted as one fixed price in a signed scope
Connections
What does a fastener ERP on Zoho connect to?
Inside the Zoho suite, data passes between apps without any connector. Counting scales, label printers and lab reports connect through files, an API or a small custom step, which we check device by device before we quote. Every connection is tagged Native, Marketplace or Custom.
Inside Zoho
One order, from quote to books
Zoho CRM to Zoho Inventory for EPC and dealer orders Native
Zoho Inventory to Zoho Books for bills, invoices and stock value Native
Zoho Analytics for scrap, yield and margin by part Native
On the floor
Counts and labels without retyping
Counting and platform scales reading weight into the packing step Custom
Barcode label printers for lot and kit labels Custom
Lab and job-worker reports attached to each lot as files Custom
Money and paperwork
Invoices, taxes and collections
E-invoice and e-way bill generated inside Zoho Books with each fastener invoice Native
Tally masters and balances moved, or kept read-only during the switch Custom
Online payment gateways that Zoho Books supports, so dealers can pay against invoices Marketplace
Rollout order
How does a running fastener plant switch without stopping its headers?
Stores and purchase first, the floor second, kits and dealers last. The order of steps stays fixed; dates go into the signed scope, since a kit packer and a plant with six headers need very different plans.
1Trace one heatWe follow one coil from receipt to invoice with your stores, floor and quality leads.
2Choose the optionZoho Solar, Zoho Solar + Custom or the complete product, with each custom screen listed.
3Clean the item listSizes, grades and finishes turned into attributes, weights per thousand checked, opening stock counted by heat.
4Stores and job work liveReceipts, quality hold, issue to work orders and challans, while production carries on.
5Floor, inspection and kitsShift logs, inspection records and kit packing tried on a pilot batch first.
6Train and reviewStore, floor, quality and sales staff trained in English, Hindi, Marathi, Tamil, Kannada or Malayalam, then a review after the first month end.
Free requirements checklist
Which of these does your fastener plant need first?
Twelve needs that come up in solar fastener plants. Tick the ones that matter to you and send the list; it fills the form below, and our solar expert brings a first view of the right option to the meeting.
0 of 12 fastener needs ticked
Where we meet
Where can a fastener manufacturer meet our team?
On your shop floor when walking the headers and the packing table helps, at our Bengaluru office by appointment, or on video for plants anywhere in India. Header operators and packers learn fastest beside their own machines.
Vasanth Nagar, Bengaluru
Find our team at #39, 8th Main Road, Vasanth Nagar (560052). Meetings by appointment with the Zoho team in Bangalore.
Engineering belts around Bengaluru
Plant visits in Peenya, Bommasandra, Jigani, Bidadi and Doddaballapur when your press shop or heading line is nearby.
Fastener plants get the same team behind the fact that we have delivered many solar projects. The quotes below are published feedback from Zoho clients in other industries, and the fastener flows on this page are illustrative with Sample figures.
The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
KVP EnterprisesFounder and CEO · manufacturing automation
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
MegawinFounder and CEO · multiple Zoho applications
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
F Care GroupFounder and CEO · Zoho Books, APIs, workflows
FAQ
Solar fastener ERP: questions from bolt and screw makers
Bring your stores lead and the person who signs off job-work bills. We reply within 1 business hour.
It is one system for a plant that makes or packs the bolts, nuts, washers, J-bolts and screws used in solar structures. It follows each heat number of wire rod from receipt to finished lot, keeps stock in kilograms and pieces, builds mounting kits, records inspection and job work, and handles quotes, GST invoices and dealer orders. On Zoho it is built from Zoho Inventory, Zoho Books and Zoho CRM, with custom Zoho Creator apps for the shop floor.
Can Zoho track heat numbers for fasteners?
Yes, as batches. The heat number from the mill certificate becomes the batch on the coil in Zoho Inventory, and a Creator work order carries it into each finished lot after heading, rolling and finishing. The certificate is attached to the batch, so a lot label on a returned bag leads back to the coil.
How do you handle stock that is bought in kilograms and sold in pieces?
Each item holds its weight per thousand pieces, and the packing step checks real counts on a counting scale. The store sees kilograms, sales sees pieces, and the two are reconciled at every packing rather than at the year-end stock count. Where a scale can send its reading, we connect it through a custom step.
Can we sell solar mounting kits made of many fastener sizes?
Yes. A kit for one module table or one structure design is a composite item in Zoho Inventory, made of the bolts, nuts, washers and screws it needs. Selling a kit reduces the stock of each part, and a kit weight check before sealing catches a missing piece.
Does Zoho manage job work for galvanising, plating or heat treatment?
Zoho Inventory holds the job worker as a stock location, so material sent out stays in your stock. We add a Creator check that compares the return with the outward challan by weight and count, and Zoho Books records the job worker's bill once the return is accepted.
Which option should a fastener manufacturer choose: Zoho Solar, Zoho Solar + Custom or the complete product?
A kit packer that buys every part often fits Zoho Solar. A plant with its own headers, rollers, job workers and inspection records usually needs Zoho Solar + Custom. A business that also makes structures or runs distribution may suit the complete end-to-end solar product. We recommend the option that fits your business after tracing one order with you.
What does a fastener ERP on Zoho cost?
Licenses are invoiced by Zoho itself, at its India list prices with GST on top. A plant on Zoho Inventory Standard pays ₹999 a month for the organisation, and each Zoho Creator Standard user adds ₹480 a month, both on yearly billing. Our setup and custom apps are a fixed fee set out in the scope you sign, after the free first meeting.
Can the system issue test certificates for our bolts?
It can store the mill certificate for each heat and your inspection or lab report for each lot, and send the right files with each dispatch. Where you issue your own test certificate format, a Creator app can fill it from the inspection record. The content and its standard stay your quality lead's responsibility.
Has Elite Tech Corp worked with solar businesses before?
Yes: alongside our wider Zoho work, we have delivered many solar projects, and client names and details stay private. At the first meeting our solar expert traces one of your own fastener orders and marks where each step would live in Zoho.
Tell us what you head, roll and pack, which finishes go out to job workers and how you count stock today. We reply within 1 business hour. No obligation.
We trace one heat number with you, from coil receipt to the EPC buyer's invoice
You see which steps are Zoho, which are a custom Creator app and which stay on your machines
Meet on video, at your plant, or at Vasanth Nagar in Bengaluru