Book a Meeting

DC SPDs · AC SPDs · plug-in cartridges · spares

Solar surge protector manufacturer ERP and CRM, from varistor lot to tripped-cartridge return

A solar surge protector manufacturer ERP tracks every varistor, gas tube and housing that goes into an SPD, ties each cartridge to its test result, and follows the unit to the panel builder or installer who fitted it. We set this up on Zoho for Indian makers of DC and AC surge protection devices: variant BOMs by voltage and type, MOV lot binning, cartridge and base assembly, routine test logs, batch labels, dealer orders, spare cartridge sales and field returns. Steps Zoho has no screen for become custom Zoho Creator apps, named as custom in the scope.

  • Zoho Advanced Partner
  • 300+ projects delivered
  • Native, custom and integrated parts labelled

We reply within 1 business hour · No obligation · First SPD review is free

MOV lot V-2611 · bin BVaristor voltage binned at inward · Sample
Cartridge C-1500-04 passedRoutine test log, Creator · Sample
One pole tripped, one cartridge to replace
300+
Projects we have delivered across Zoho
2021
When our first Zoho rollout went live
6 languages
English, Hindi, Marathi, Tamil, Kannada and Malayalam training
ZohoAdvancedPartner

Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner

Where SPD plants lose time

What goes wrong in a surge protector plant that runs on spreadsheets?

The product is small, but one SPD order holds many decisions: voltage, type, number of poles, remote contact, cartridge code. Spreadsheets lose the link between those choices, the varistor lot inside and the test that passed it. Six problems come up again and again.

  1. Variants multiply faster than item codes

    A 1000 V and a 1500 V DC unit, two or three poles, with or without a signalling contact: each mix needs its own BOM, and copied rows drift apart.

  2. Varistor bins get mixed on the bench

    Discs are bought by rating, but each lot measures slightly differently. Without a bin on the lot, a cartridge can end up with a disc meant for a lower voltage.

  3. Test sheets sit in a file nobody can search

    Varistor voltage, leakage and indicator checks are written per tray. When a buyer asks about one batch, someone opens a folder of paper.

  4. Wrong cartridge, right base

    A cartridge built for one voltage can fit a base built for another unless coding is checked. The mistake is usually found by the customer.

  5. Spare cartridges are sold off the books

    Installers and O&M teams phone for replacement cartridges after a storm. Those sales rarely link back to the original unit or to stock.

  6. Every return looks like a warranty claim

    A cartridge that tripped after a real surge did its job. A cartridge that failed in normal service did not. Without the batch history, both get the same answer.

Who it fits

Which kind of SPD maker is this setup built for?

Any Indian maker or assembler of surge protection devices that sells into solar, from a unit that assembles imported cartridges to one that builds its own varistor modules. Choose the one nearest your SPD plant.

You assemble from imported cartridges

Bases, housings and labels are local; the plug-in modules come in by the carton. The job is clean stock by cartridge code, a lot on every receipt and a check that each base gets the right module.

Starts withZoho Inventory composite items and Zoho Books

You build your own varistor modules

Discs, gas discharge tubes, thermal disconnect parts and moulded housings come from different vendors. Lot binning, a cartridge build log and routine test records matter most.

Starts withZoho Inventory, a Creator build and test app

SPDs are one line among several

You also make fuses, isolators or distribution boxes. The SPD line shares stores, buyers and dispatch with the others, so it needs its own BOMs inside one shared system.

Starts withProduct-wise assemblies, a shared Zoho CRM

Building complete combiner boxes or DCDBs with SPDs inside? The SPD becomes one part in a bigger BOM; the solar manufacturing software page covers the panel-building side, and this page covers the protector itself.

The making of one SPD order

How does a solar surge protector move from parts to a packed carton?

Seven stages, from the order that fixes the variant to the spare cartridge sold after a storm. Scroll through them: the rail tracks your place, each scene names the Zoho app or custom app that keeps its record, and every code shown is Sample.

  1. Order and variant
  2. Inward and binning
  3. Cartridge build
  4. Base and final assembly
  5. Routine tests
  6. Label, pack, dispatch
  7. Spares and returns

Stage 1 · Order and variant

The order fixes the variant before anyone touches a part

A panel builder wants three-pole DC units for 1500 V strings with a signalling contact; a distributor wants single-phase AC units in cartons of ten. Each option is a choice on the quote, and the confirmed choice becomes one variant code with its own BOM. Sales never types a part list by hand.

  • Zoho CRM
  • Zoho Inventory

Stage 2 · Inward and binning

Discs, tubes and housings wait in quality hold until they are measured

Every receipt gets a lot number. Varistor discs are sampled and sorted into bins by measured voltage; gas discharge tubes, thermal disconnect springs, low-melt solder and flame-retardant housings get their own inward checks. Only a lot that has passed, with its bin recorded, can be issued to the bench.

  • Zoho Inventory
  • Zoho Creator (custom)

Stage 3 · Cartridge build

Each plug-in cartridge is a small assembly with its own history

The work order issues a disc lot, a disconnect lot and a housing lot to the bench. Operators solder the disc to the thermal disconnector, close the housing and log the tray on a tablet: quantity, bin used, rejects with a reason. The cartridge becomes stock with a lot that points back to every part inside.

  • Zoho Inventory
  • Zoho Creator (custom)

Stage 4 · Base and final assembly

The base meets its cartridges, and a scan stops the wrong pairing

Bases get terminals, the status window and, where ordered, the signalling micro-switch. Before a cartridge is pushed in, the operator scans both labels; a custom check refuses a voltage or type that does not match the variant. Finishing the unit consumes the base and cartridges and adds a finished SPD to stock.

  • Zoho Inventory
  • Zoho Creator (custom)

Stage 5 · Routine bench checks

Every unit is checked on the bench; type tests stay with the lab

Routine checks such as varistor voltage, leakage current, indicator operation and insulation run on each unit or sample, as your quality plan sets. The bench file is imported into a Creator test log against the batch or serial, and a fail moves the unit to a rework location. Impulse type tests happen at a test lab on sample units; the system stores the report number and its validity per model.

  • Zoho Creator (custom)
  • Bench file import or API

Stage 6 · Label, pack, dispatch

Cartons leave with batch numbers a buyer can quote back

The rating label and batch or serial label print from the same record, so they always agree. Packing scans cartons onto the shipment, and the invoice goes out with its e-invoice and e-way bill details and a list of batches. A panel builder that fits your SPDs into its boxes can then trace them in its own records.

  • Zoho Inventory
  • Zoho Books

Stage 7 · Spares and returns

After a storm, the cartridge business begins

Installers and O&M teams order replacement cartridges by code, through a dealer or direct, and those sales come out of the same stock. When a unit comes back, the service desk opens its batch: test result, dispatch date, buyer. Your quality lead then decides whether the cartridge tripped as designed or failed early, and the answer goes back with the reason.

  • Zoho Desk
  • Zoho Inventory
  • Zoho CRM

Technical boundary

Which parts are native Zoho, which are custom, and which are integrations?

Zoho handles items, variants, lots, stock, buyers, invoices and tickets out of the box once configured. Binning, the pairing check and the test log are custom Creator apps. Test benches and lab reports stay in their own systems and connect by file or API.

Native Zoho features we configure for SPDs

  • Variant items and composite assemblies for bases, cartridges and finished SPDs
  • Lot and batch numbers on every disc receipt, issue and SPD sale
  • Quality-hold and rework locations
  • Purchase orders, vendor bills and debit notes for rejected lots
  • Tax invoices carrying IRN and e-way bill data
  • Dealer and panel-builder accounts, quotes and orders
  • Service tickets for returns

Custom SPD apps in Zoho Creator

  • Varistor lot binning with measured values
  • Cartridge tray log with rejects and reasons
  • Scan check that pairs cartridge and base codes
  • Routine test log per batch or serial
  • Return triage form: tripped by surge or early failure
  • Type-test report register with validity dates per model

Stays outside, connected by integration

  • Test bench software and its raw readings
  • Impulse type tests at the external lab
  • Product design files and drawings
  • Label printer drivers
  • Moulding machine settings at your housing vendor

On standards and approvals: PV surge protectors are tested to product standards such as IEC 61643-31, and buyers or tenders may ask for specific certificates. Your quality team and the test lab handle the testing and any certification. The system records report numbers, validity dates and which models they cover; it does not certify, file or speed up anything. Rules and tender terms change, so check the official source or the buyer's specification each time.

Three ways to build it for SPDs

Should an SPD maker start with Zoho Solar, add custom apps, or take the full product?

We offer all three and we recommend the option that fits your business after we have seen your bench and your order book. The table sets them against the paper and Excel routine many SPD units still use.

Paper and Excel compared with three Elite Tech Corp solar options for a surge protector maker
Plant job Paper and ExcelCommon starting point Zoho SolarStandard Zoho apps set up for SPD work Zoho Solar + CustomZoho plus SPD-specific Creator appsCommon for own-cartridge makers Complete end-to-end solar productOur own solar system, plant to after-sales
One BOM per voltage, type and pole countCopied sheetsZoho Inventory variantsZoho Inventory variantsIncluded
Varistor binning at inwardMarker on the boxLot field onlyCreator binning appIncluded where scoped
Cartridge to base pairing checkOperator memoryNot nativeCustom scan checkIncluded where scoped
Routine test record per batchPaper sheet per trayAttachment on the batchBench import into a Creator logIncluded
Spare cartridge sales to installersCash sale, no linkInventory with Books invoicingPlus dealer ordering portalIncluded
Return triage by batch historyEmail threadZoho DeskZoho Desk with triage formIncluded
Adding AC SPDs or a new rating laterNew sheets againNew variants configuredNew variants plus custom checksProduct roadmap plus your settings

A unit that only assembles imported cartridges often runs well on Zoho Solar. Once you bin your own discs and build cartridges, the custom column usually earns its cost. The reasons for our recommendation go into the written scope.

By buyer

How does the setup change for each type of SPD buyer?

The plant stays the same, but each buyer orders, pays and complains differently. These are illustrative setups for five buyer types. Pick the one that brings you the most orders.

Combiner box, ACDB and DCDB builders

Steady monthly volumes of a few variants, scheduled releases against a rate contract, and strict asks on batch traceability because the SPD sits inside their own product.

  1. Rate contract
  2. Monthly schedule
  3. Release by variant
  4. Batch list with invoice
  5. Quarterly review

Software for solar panel builders and makers

  • Usually fitsZoho CRM with Inventory and Books for scheduled releases
  • Key setupPrice lists per buyer, scheduled sales orders, batch list on every invoice
  • Watch forBuyer part numbers that differ from yours; map them once on the item

Automations

Which SPD plant checks can run on their own?

Six triggers that save a surge protector plant the most chasing. You decide the limits and who gets told; we build the rule.

  • WhenA disc lot is received without a binIt cannot be issued to any cartridge work order until binning is saved.Creator binning + Inventory
  • WhenA scanned cartridge code does not match the base variantThe assembly screen blocks the step and logs the attempt for the line lead.Zoho Creator
  • WhenA tray's reject count crosses your limitQuality gets the tray, the disc lot and the operator shift in one message.Zoho Creator
  • WhenA model's lab report is near its validity dateSales and quality see a warning on quotes for that model.Creator + Zoho CRM
  • WhenSpare cartridge stock for a code drops below reorder levelA build request goes to the plant before the next lightning season.Zoho Inventory
  • WhenThree returns arrive from one batchQuality is alerted and other buyers of that batch are listed for review.Zoho Desk + Creator triage

License cost

What do the Zoho licenses cost for an SPD plant?

Zoho Inventory and Zoho Books are priced per organisation, so a small SPD unit pays the same for them whether five or fifteen people use them. Bench and line users need Creator seats. Zoho Creator Standard is ₹480 per user a month on yearly billing, plus GST. Pick a plan below for an SPD plant estimate at Zoho's India list prices.

  • Figures are an estimate; your SPD plant pays Zoho for licenses
  • Bench operators logging trays use Creator, not CRM seats
  • Our setup and custom work: a fixed price in a signed scope

Connections

What does SPD manufacturing software on Zoho connect to?

Inventory, Books, CRM and Desk share SPD records without any connector. Test benches, label printers and your old accounts connect through files or an API, and we check each one before we quote. Every link below carries its label.

Inside Zoho

One SPD order from quote to cash

  • Zoho CRM to Zoho Inventory for variant quotes and confirmed orders Native
  • Zoho Inventory to Zoho Books so disc purchases, SPD sales and stock value post to accounts Native
  • Zoho Desk with Zoho CRM for returns against the buyer's account Native

On the bench

Bench readings and SPD labels, typed once

  • Varistor and leakage test benches through their export files into the Creator test log Custom
  • Barcode and rating label printers fed from the item and batch record Custom
  • Handheld scanners for the cartridge and base pairing check Custom

Money and records

Cartons, invoices and ledgers agree

  • E-invoice (IRN) and e-way bill details raised in Zoho Books Native
  • Tally balances and item history brought across, or kept for reference Custom
  • Payment gateways Zoho Books supports, for dealer and spares payments Marketplace

Rollout order

How does an SPD plant switch systems without stopping production?

Stores first, then the bench, then sales and service. The steps stay in this order; the dates are agreed in the signed scope, because a cartridge assembler and a plant that bins its own discs need different plans.

  1. 1Trace one orderFrom disc lot to packed carton with your quality lead, stores and sales.
  2. 2Pick the optionZoho Solar, Zoho Solar + Custom or the complete product, with each custom app listed.
  3. 3Variants and BOMsVoltage, type and pole options turned into variant codes; opening stock counted by lot and bin.
  4. 4Stores and inward liveQuality hold, binning and issue to cartridge work orders while the bench keeps working.
  5. 5Bench and labelsPairing scan, test import and labels tried on a pilot batch first.
  6. 6Sales, spares, trainingDealer price lists and the returns desk switched on; staff trained in English, Hindi, Marathi, Tamil, Kannada or Malayalam.

Free requirements checklist

Which of these does your SPD plant need first?

Twelve needs surge protector makers raise. Tick what applies and send the list: it fills the form below, so our solar expert arrives with a first view of the right option.

0 of 12 SPD needs ticked

Parts and stores
Build
Tests and records
Sales and service

Meet us

Where can an SPD manufacturer meet our team?

On your shop floor when seeing the bench helps, at our Bengaluru office by appointment, or on video for plants anywhere in India. Bench staff training works best on site, between batches.

Vasanth Nagar, Bengaluru

Our office is at #39, 8th Main Road, Vasanth Nagar, Bengaluru 560052, with meetings by appointment. See our Zoho partner team in Bangalore.

SPD and switchgear belts near Bengaluru

Plant visits in Electronic City, Peenya, Bommasandra and Hosur Road, where many electrical component units work.

South India plants

For units in Tamil Nadu or Kerala, our Coimbatore head office team and Kochi Zoho team are nearer.

SPD bench training in your language

Stores, bench, quality and accounts users trained in English, Hindi, Marathi, Tamil, Kannada and Malayalam.

SPD plant outside South India?

We trace your first order on video and come in for the pilot batch if needed. Book your meeting with our solar expert today

What clients say

What do our Zoho clients say after working with Elite Tech Corp?

Yes, we have delivered many solar projects. The quotes below are published feedback from Zoho clients in other industries, and the SPD flow on this page is illustrative with Sample codes.

The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
KVP EnterprisesFounder and CEO · manufacturing automation
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
MegawinFounder and CEO · multiple Zoho applications
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
F Care GroupFounder and CEO · Zoho Books, APIs, workflows
TrukkingLulu HolidaysMegawinJADKingsSygaardJemkonBrealantRockolyLendonRohealthTengani

FAQ

Questions SPD manufacturers ask about ERP and CRM

Ask your quality lead and stores in-charge to join the first SPD call. We reply within 1 business hour.

Book your meeting with our solar expert today
What is an ERP for solar surge protector manufacturers?

It is one system that links what an SPD plant buys, builds, tests and sells: variant BOMs by voltage, type and poles, varistor and housing lots, cartridge and base assembly, routine test records, batch labels, dispatch with GST invoices, spare cartridge sales and returns. On Zoho it combines Zoho Inventory, Books, CRM and Desk with custom Zoho Creator apps for binning, pairing checks and test logs.

Can Zoho handle the many variants of DC and AC surge protectors?

Yes. Zoho Inventory supports item variants and composite items, so a 1000 V or 1500 V DC unit, an AC unit, a pole count and an optional signalling contact each become a variant with its own BOM. Sales chooses options on the quote and the right BOM follows the order.

How do we trace a returned SPD back to its varistor lot?

Each cartridge lot is built on a work order that records the disc, disconnect and housing lots issued to it, and the finished unit carries a batch or serial label. The service desk opens that number and sees the parts, the routine test result and the dispatch date on one screen.

Does Zoho store routine test results and lab type-test reports?

Routine bench results are imported from the tester's export file into a custom Creator test log against each batch or serial. Lab type-test reports are stored as a register with report numbers, validity dates and covered models. Testing and certification stay with your quality team and the lab.

Can the system stop a cartridge being fitted to the wrong base?

Yes, with a custom step. The operator scans the cartridge and base labels, and a Creator check blocks any voltage or type that does not match the variant on the work order. Standard Zoho Inventory does not do this check on its own.

How should we handle spare cartridge sales and tripped returns?

Spare cartridges are sold as their own items from the same stock, through dealers or direct, so reorder levels stay true. Returns open a Zoho Desk ticket with the batch history, and your quality lead records whether the cartridge tripped as designed or failed early before the reply goes out.

Which option should an SPD maker choose: Zoho Solar, Zoho Solar + Custom or the complete product?

A plant that assembles imported cartridges often fits Zoho Solar. A plant that bins its own discs and builds cartridges usually needs Zoho Solar + Custom for binning, pairing and test logs. A company that also distributes and services across the solar chain may suit the complete end-to-end solar product. Once we have seen your bench, we recommend the option that fits your business and give the reasons.

What will the Zoho licenses cost a small SPD plant?

Zoho bills its licenses at India list prices, plus GST. Zoho Inventory Standard is ₹999 per organisation a month and Zoho Creator Standard is ₹480 per user a month, both on yearly billing. Our SPD setup and custom apps are priced as one fixed figure in a signed scope, agreed after the free first meeting.

Have you worked with solar component makers before?

We have delivered many solar projects and keep client details private. In the first meeting our solar expert traces one of your real SPD orders and shows where each step would sit in Zoho, in a custom app or in your existing tools.

SPD plant review

Book your meeting with our solar expert today

Tell us which SPD types you make, how cartridges are built and tested today, and who buys from you. We reply within 1 business hour. No obligation.

  • We trace one SPD order from varistor lot to packed carton with your quality lead
  • You see which records are Zoho, which are custom and which stay on your test benches
  • Meet on video, at your plant, or at Vasanth Nagar in Bengaluru

Tell us about your business

Three short steps. Fields marked * are required.

Your need
Your company
How we reach you

Privacy notice. We collect the details in this form (name, business email, phone, company, city and your requirement) only to reply to your enquiry and arrange the assessment. They are stored in Zoho CRM, the system we use to manage enquiries, and are never sold or used for advertising. The updates box is optional and you can withdraw it at any time. To see, correct or delete your details, or to withdraw consent, call +91 89259 24785 or message us on WhatsApp. Read our privacy policy.