Solar business compliance checklist for India: what to register once, file on schedule and keep for every project
A solar business compliance checklist for India has four layers. First, the registrations you take once (company, PAN, GST, the state electrical contractor license, labour registrations, scheme vendor registration). Second, the filings that repeat each month, quarter and year. Third, the file you build for every project: DISCOM application, module and cell papers, inspection, commissioning and handover. Fourth, the people who own each task. This guide lists all four, explains where each item is checked, and shows how to track them without spreadsheets that one person forgets to update.
We reply within 1 business hour · No obligation
Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner
The checklist in five lines
- Solar compliance is less about one permit and more about a calendar: most penalties come from a missed return or a lapsed license, not from a missing registration.
- Every grid-connected project carries its own paperwork trail, and a gap in that trail can hold up a net meter or a subsidy for weeks.
- Module and cell records have to be collected when material is bought, because nobody can rebuild them after the crew has left the roof.
- Each line needs one named owner and a reminder date, or it belongs to nobody.
- Software can hold the dates, files and owners; your CA, electrical license holder and compliance lead decide what the rule is.
What does compliance actually cover for a solar company in India?
It covers four kinds of obligation: who your company is (registrations), what it owes the government on a schedule (returns and contributions), what each installation must prove before it is connected or claims a subsidy, and the records that back all of it up later.
Most checklists for solar businesses stop at the first kind. That is where a founder starts, so it feels like the whole job. In practice the registrations take a few weeks once, while the filing rhythm and the project files never stop. A rooftop EPC doing twenty homes a month opens twenty small compliance files every month, each with its own DISCOM status, module serials, photos and signatures.
The obligations also shift with the business type. An installer working under another EPC carries less project paperwork but still needs the electrical license and labour cover for its crew. A distributor lives in GST, e-way bills and supplier documents. A module or inverter maker adds factory, product and approved-list duties on top. The table in the next section lets you filter by the type that matches you.
One caution before the lists. This is an operating guide written by a software company, not legal or tax advice. We name the office that decides each item and leave the thresholds, fees and due dates to them, because those numbers move.
Layer 1 · Done once, renewed when due
Which registrations does a solar business need before it takes paid work?
At minimum a legal entity, PAN and TAN, GST registration and the state electrical contractor license for installation work, followed by labour registrations as you hire. Scheme vendor registration comes in when you want subsidised home rooftop work.
Show the items for:
11 items shown
| Registration | Why a solar business needs it | Who decides |
|---|---|---|
| Company or LLP | The entity signs contracts, holds licenses and opens the current account. Banks, scheme portals and large buyers want a registered entity rather than a person. | mca.gov.in |
| PAN and TAN | PAN for the entity's own tax; TAN because you will deduct tax at source on sub-contractor bills, rent and salaries. | incometax.gov.in |
| GST registration | Business buyers claim input credit only on a valid GST invoice, and moving material between states or above set values needs e-way bills tied to your GSTIN. | gst.gov.in |
| Electrical contractor license | Grid-connected installation is electrical work done under a licensed contractor with qualified supervisors. Check which class of license your plant sizes call for. | Your state's electrical licensing board or inspectorate |
| Udyam (MSME) | Optional, but it opens some bank schemes and tender relaxations and gives small firms protection on delayed payments from buyers. | The MSME ministry's Udyam portal |
| Shop and establishment | A state registration for the office or warehouse where staff work. Some cities add a separate trade license for the premises. | State labour department, local body |
| Professional tax | Several states, Karnataka among them, levy it on salaries and expect the employer to register, deduct and pay. | State commercial tax department |
| EPF and ESI | Due once headcount crosses each law's limit. Site crews count, so a growing installation team often triggers these sooner than founders expect. | epfindia.gov.in, esic.gov.in |
| Scheme vendor registration | Homes can only pick a vendor registered on the national rooftop scheme portal, at state level or nationally. Without it you cannot install subsidised home systems. | pmsuryaghar.gov.in and your state's nodal agency |
| Import Export Code | Needed if you import modules, cells, inverters or spares, or export finished products. | DGFT |
| Factory and product approvals | A plant needs its factory license and pollution consents, and modules sold into regulated projects must be on MNRE's approved lists. Product testing and certification rules apply to what you make. | State factories and pollution boards, MNRE, the certifying body for your product |
No fees or thresholds in this table, on purpose: they vary by state and are revised. Rules change; check the official portal for each registration before you file, and keep the certificate number, issue date and renewal date in one register. Starting from zero? Our guide on how to start a solar EPC business in India covers the order a new firm usually takes these in.
Layer 2 · On a schedule
What does a solar company have to file every month, quarter and year?
GST returns, TDS deposits and payroll contributions recur every month or quarter; TDS statements are quarterly; accounts, ROC returns, income tax and the tax audit where it applies are yearly; licenses and vendor registrations renew on their own dates. Your CA sets the exact due dates for your registrations.
The monthly close
Month end is where a solar firm's sales and site work turn into tax. Invoices raised for milestones, advances received against new bookings and supplier bills all feed the GST return, so the books have to be closed before the CA can file. Payroll for office staff and site crews produces the PF, ESI and professional tax payments.
- Close invoices
- Match supplier bills
- GST return
- TDS deposit
- Payroll dues
- Usual ownerAccounts, with the CA filing
- Where it slipsSite advances never invoiced, so GST is paid late
- HelpsMilestone billing linked to project stages
The quarterly returns
TDS statements for salaries, contractor and rent payments go in each quarter, and smaller taxpayers may be on a quarterly GST scheme instead of monthly. Advance tax instalments also fall quarterly for profitable firms. This is a good point to review open DISCOM files and stuck subsidy claims too, since they tie up cash.
- TDS statements
- Advance tax
- Quarterly GST, if opted
- Open project review
- Usual ownerCA, with accounts preparing data
- Where it slipsSub-contractor PANs missing, so deductions mismatch
- HelpsVendor master with PAN checked at onboarding
The year end
Annual accounts, the income tax return, the tax audit when turnover crosses the limit, the annual GST return where it applies and the company's or LLP's ROC filings. Year end is also when an EPC should check every active AMC contract and warranty period against the projects it handed over.
- Close the books
- Audit
- ROC filings
- Income tax return
- AMC and warranty review
- Usual ownerDirector, CA and company secretary
- Where it slipsProject costs never closed, so margins in the accounts are wrong
- HelpsPer-project cost records kept through the year
Renewals that keep their own calendar
The electrical contractor license, the supervisors' certificates, the shop and establishment registration, trade licenses, insurance policies, scheme vendor registration and any tender empanelment each expire on their own date. None of them reminds you. Put each date in the register the day the certificate arrives.
- License
- Supervisor certificates
- Insurance
- Vendor registration
- Empanelments
- Usual ownerAdmin or the founder
- Where it slipsThe license holder leaves and nobody notices
- HelpsReminders 60 and 15 days before each expiry
Exact due dates and the monthly or quarterly choice depend on your registration and are set by the tax departments. Confirm your calendar with your CA on gst.gov.in and incometax.gov.in, and with your payroll adviser for PF, ESI and professional tax.
Layer 3 · Every installation
What goes into the compliance file for each solar project?
For a grid-connected plant: the signed contract and customer consent, the DISCOM application and its approval, module and inverter papers with serials, installation and safety records, the inspection or commissioning report, any scheme claim, and the handover pack. Build the file as the work happens, stage by stage.
1Contract and customer documentsSales
Keep the signed quotation or contract with the agreed system size, make and model of modules and inverter, payment milestones and warranty terms. Add the electricity bill and consumer number the DISCOM application will need. Customer bills and ID copies hold personal data, so store them in one access-controlled place, not in a phone gallery, and take advice on how India's Digital Personal Data Protection Act, 2023 applies to your firm.
2DISCOM application and approvalLiaison
Record the application number, the date filed, the metering type (net metering, net billing, gross, group or virtual) and each status change on the DISCOM portal. In Karnataka, for example, KERC's 2026 rooftop regulations treat the online application for plants from 1 to 150 kW as approval to start work and give the consumer 150 days to upload the work completion report. Rules change; check the official portal of your DISCOM and regulator before you promise a date. Our BESCOM net metering guide for installers walks through one DISCOM in detail.
3Material and module recordsPurchase and stores
For every site: the purchase order, supplier invoice and e-way bill, the module make and model checked against the approved list, the serial number of each module and inverter, and the domestic content certificate where the project needs DCR modules. Link serials to the site when material is issued from stores, not when someone asks for them a year later.
4Installation and site safetySite
Keep the approved layout and single-line diagram, the name of the licensed supervisor on the job, the daily site report, safety checks for work at height, and photos of structure, earthing and cable routing. Geo-tagged photos are also what the home rooftop scheme asks the consumer to upload, so take them in the format the portal accepts.
5Inspection, testing and commissioningSite and liaison
File the test readings (insulation, earthing, inverter settings), the work completion report, the DISCOM or inspectorate inspection report, the net meter installation date and the commissioning certificate. Larger plants may need the state electrical inspectorate's approval before they are energised; ask the inspectorate which sizes need it in your state.
6Subsidy or scheme claimLiaison and accounts
For a subsidised home system, track the portal stages through to the subsidy release so the customer is never left guessing. For tenders, keep the work order, measurement records and completion certificate the agency asks for. Our PM Surya Ghar vendor process guide lists the home scheme's steps.
7Handover, warranty and serviceService
Give the customer the handover pack: serials, warranty cards, the generation and maintenance guide, test readings and a signed handover checklist. Keep your copy with the project, start the warranty and AMC dates, and log every later service visit against the same record.
Which module and cell records protect a net-metering or subsidy claim?
Keep proof that each module was on MNRE's ALMM List-I and, where the rule applies, that its cells were on List-II; for subsidised home systems, keep the domestic content papers that show modules and cells were made in India.
This is the part of solar compliance that moved most in 2026. MNRE's memo of 18 July 2026 allows net-metering and open-access projects commissioned up to 31 December 2026 to skip the List-II cell rule, while List-I modules stay mandatory; projects commissioned after that date must meet List-II. Home systems under the PM Surya Ghar "Give It Up" option have until 31 March 2027. Subsidised home systems still need DCR modules made from Indian cells, whatever the ALMM window says. Rules change; check the official portal at mnre.gov.in for the latest memo before you order material for a project.
The practical point for a business is timing. The commissioning date decides which rule applies, but the module choice is made weeks earlier at purchase. So the project file has to carry the planned commissioning date, the module's list status at purchase and the supplier's certificates from day one. Our ALMM List-II and DCR guide for EPCs sets out the rule by project type.
What changes for distributors and manufacturers?
A distributor's compliance weight sits in GST, e-way bills, stock records and supplier certificates that dealers and EPCs will ask for. If you sell modules into subsidised or net-metering projects, your buyers will want list status and DCR papers by serial or batch, so keep them indexed against your stock, not in an email folder. A manufacturer adds the factory license, pollution consents, product testing and certification, approved-list enlistment and its revisions, plus warranty obligations that run for decades. Each of those has its own renewal and audit trail.
Layer 4 · People
Who in a solar company should own each compliance task?
Give every line a single named owner and a backup. In a small firm one person may own several lines, which is fine as long as the register says so and the reminders go to them.
| Task | Owner | Backup | Evidence kept |
|---|---|---|---|
| GST, TDS and annual returns | Accounts | External CA | Filed return acknowledgements, reconciliations |
| PF, ESI and professional tax | HR or payroll | Accounts | Monthly challans, employee registrations |
| Licenses and renewals | Admin | Founder | Certificates, renewal receipts, supervisor list |
| DISCOM and scheme portal files | Liaison executive | Project manager | Application numbers, status history, approvals |
| Module and supplier papers | Purchase | Stores | List status at purchase, DCR certificates, serials by site |
| Site safety and testing | Licensed site supervisor | Project manager | Daily reports, test readings, photos |
| Handover, warranty and AMC | Service head | Project manager | Signed handover, warranty start dates, visit logs |
Sample allocation for a small EPC. Your structure will differ; what matters is that no line is left without a name.
Tracking it in Zoho
How can Zoho apps track a solar company's compliance work?
Zoho Books and Zoho Payroll handle much of the tax and payroll side as shipped for India; Zoho CRM or Zoho Projects with WorkDrive can hold each project's file once configured; a compliance register with renewal reminders and serial-to-site records is usually a custom Zoho Creator app. Government portals stay separate.
| Compliance work | Zoho app | How |
|---|---|---|
| GST invoices, e-invoices (IRN) and e-way bills | Zoho Books | Native India edition features; your CA still reviews and files returns |
| TDS on contractor and rent bills | Zoho Books | Native tax deduction on bills, with reports for the CA |
| PF, ESI and professional tax on salaries | Zoho Payroll | Native statutory components set per state |
| Stage-wise project file with required documents | Zoho CRM or Zoho Projects, Zoho WorkDrive | Setup blueprint stages that will not move on until the document is attached |
| Signed contracts and handover checklists | Zoho Sign | Native e-signature with an audit trail |
| License, registration and insurance register with reminders | Zoho Creator | Custom one register, owners, expiry alerts by email or WhatsApp |
| Module serials, list status and DCR papers by site | Zoho Inventory with Zoho Creator | Custom serial tracking plus a certificate register linked to each project |
| DISCOM, scheme and DCR portal status | Zoho CRM or Creator | Custom status entered by your liaison person; we know of no direct link to these portals |
Zoho keeps the dates, files and owners. It does not decide whether a filing is right or a module meets a scheme rule; your CA and compliance lead do. See how this fits a whole firm on our solar EPC software page, or the tax side on Zoho Books for solar companies and Zoho Payroll for solar teams.
How we help
Which of our three solar options suits a firm that wants compliance under control?
We offer three options and we recommend the option that fits your business, after we have looked at your business type, project volume and where your registers live today.
Option 1
Zoho Solar
Solar workflows configured on Zoho apps: GST and payroll on Books and Payroll, project files with stage checks in CRM or Projects, documents in WorkDrive. Fits a firm whose main gap is discipline rather than missing tools.
Option 2
Zoho Solar + Custom registers and portals
The same base plus custom-built pieces such as a Creator compliance register, a module certificate tracker by serial, or a portal for sub-contractors to upload site photos and test readings.
Option 3
Our complete end-to-end solar product, records included
Our complete solar business product across the value chain, with registrations, project files, material records and service in one system, for firms that would rather start from a finished product.
Free gap check
Where are the gaps in your solar compliance tracking?
Tick each statement that is true for your firm today. Send the result to a solar consultant for a view on what to fix first, or copy it for your CA.
Client voices
What do Elite Tech Corp clients say about a Zoho rollout?
These quotes are from our clients in other industries, published on our website. In solar, we have delivered many solar projects, and we keep those companies unnamed.
The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
Who wrote this checklist, and where should you confirm each rule?
This checklist comes from the operating side: how registrations, filings and project papers move through a solar firm and where they get lost. We build business software on Zoho as a Zoho Advanced Partner; we are not a tax adviser, licensing body, DISCOM or scheme agency, and we hold no approval role. Treat this page as a way to build your register rather than as legal or tax advice, then confirm each item with the office that owns it and with your CA.
Official sources to check, as of 22 November 2026:
- Company and LLP filings: mca.gov.in
- GST registration, returns, e-invoices and e-way bills: gst.gov.in and einvoice1.gst.gov.in
- PAN, TAN, TDS and income tax: incometax.gov.in
- Provident fund and employee insurance: epfindia.gov.in and esic.gov.in
- Approved module and cell lists, DCR and scheme memos: the Ministry of New and Renewable Energy, mnre.gov.in
- Home rooftop scheme and vendor registration: pmsuryaghar.gov.in
- Karnataka rooftop regulations: KERC, kerc.karnataka.gov.in; elsewhere, your state regulator and DISCOM
FAQ
Solar compliance questions owners ask us
Bring your license list and one recent project file to the meeting, and we will show you how they would sit in Zoho.
Book your meeting with our solar expert todayWhat is on a solar business compliance checklist in India?
Four layers: one-time registrations (company, PAN and TAN, GST, the state electrical contractor license, labour registrations and, for home rooftop subsidy work, scheme vendor registration), recurring filings (GST, TDS, payroll contributions, annual accounts and ROC returns), a compliance file for every project, and a named owner for each line. Confirm the thresholds and dates with the issuing offices and your CA.
Is there one license that covers a solar business in India?
No. A solar company stacks several registrations. Installation work also needs a licensed electrical contractor under your state's rules, and each grid-connected project needs its own DISCOM approval.
Which compliance tasks does a solar EPC firm repeat every month?
Usually the GST return, TDS deposits on contractor, rent and salary payments, and PF, ESI and professional tax on payroll. Some smaller firms file GST quarterly. Your CA sets the exact dates for your registrations.
What documents should a solar company keep for each installation?
The signed contract, the customer's electricity bill and consumer number, the DISCOM application and approval, purchase and supplier papers with module and inverter serials, DCR papers where needed, site and safety records, test readings, the inspection or commissioning report, any subsidy claim, and the signed handover pack.
Do solar projects in 2026 need ALMM List-II cells?
Under MNRE's memo of 18 July 2026, net-metering and open-access projects commissioned up to 31 December 2026 are exempt from the List-II cell rule but still need List-I modules, and projects commissioned later must meet List-II. Subsidised home systems still need DCR modules. Rules change, so check mnre.gov.in before ordering material.
Who should be responsible for compliance in a small solar company?
Split it by task: accounts for tax, HR or payroll for contributions, admin for licenses, a liaison executive for DISCOM and scheme files, purchase for module papers and the licensed supervisor for site records. Give each line one owner and one backup.
Can Zoho make a solar company compliant?
No software can do that, and we do not claim it. Zoho Books and Zoho Payroll handle GST, e-invoicing, e-way bills, TDS and payroll contributions as shipped for India, Zoho CRM or Projects can enforce a document checklist per project, and a custom Zoho Creator app can hold your license register and module certificates. Your CA and compliance lead decide what each rule requires.
How do I keep track of license and registration renewals?
Keep one register with each certificate number, issue date, expiry date, owner and a scanned copy, and set reminders well before each expiry. A shared spreadsheet works for a few items; a Zoho Creator register with automatic reminders suits firms with many licenses, supervisors and empanelments.