Book a Meeting

DC power optimisers · module-level power electronics · smart module boards

Solar power optimiser manufacturer ERP and CRM, every unit traced from MOSFET lot to rooftop

A solar power optimiser manufacturer ERP links each finished unit to the board, the firmware, the burn-in result and the buyer it shipped to. We set it up on Zoho for Indian makers of DC optimisers and other module-level electronics: component reels received with their lot and date codes, PCB assemblies built in house or at an EMS partner, firmware images released by version, end-of-line results stored per serial, GST invoices to distributors and EPC buyers, and warranty returns opened by the serial an installer reads off the roof. Where Zoho has no ready screen for a step, we build it in Zoho Creator and mark it custom.

  • Zoho Advanced Partner
  • 300+ projects delivered
  • Native Zoho, custom apps and test-station links shown separately

We reply within 1 business hour · No obligation · Your first plant review is free

Unit OP-2611-04417 · board B-77213Serial linked to its PCB and firmware · Sample
Burn-in passed · EOL efficiency loggedCustom Creator test record · Sample
One module in, one tuned output to the string
300+
Zoho and custom software projects completed
2021
Year Elite Tech Corp started delivering Zoho work
3 offices
Coimbatore head office plus Kochi and Bengaluru teams
ZohoAdvancedPartner

Also Zoho Creator Registered, Zoho Catalyst, AWS and Shopify Partner

Where optimiser plants lose control

Why is an optimiser harder to run on spreadsheets than a bigger product?

Because the value sits in tiny parts, invisible code and a test you cannot repeat on the roof. One optimiser holds dozens of electronic components, a firmware build and a measured efficiency, and every one of them can matter years later when a single unit fails on a customer's array.

ComponentsNobody can say which MOSFET lot went into which unit

Reels arrive from importers and distributors with their own date codes. Once they are loaded on the pick-and-place machine, the link between a reel and a finished serial is usually lost.

MoistureOpened reels sit on a shelf with no clock running

Moisture-sensitive packages have a limited floor life once their bag is cut. A notebook on the dry cabinet is the only record of when each bag was opened.

FirmwareThree firmware builds are in use and only engineering knows

The flashing jig loads whatever file is on its laptop. When a field issue points to one build, sales cannot tell which customers received it.

TestingBurn-in and end-of-line files pile up on a shared drive

Each station writes its own CSV. Finding the efficiency reading for one returned unit means opening dozens of files by hand.

EMS partnerBoards built outside come back without their history

The contract assembler ships good boards and a delivery challan. Their AOI and in-circuit results stay in the assembler's system, not yours.

ReturnsA warranty claim begins with a photo of a faded label

The installer sends a picture from the roof. Matching that serial to a batch, a build date and a buyer takes a day of searching.

Who it fits

What kind of optimiser maker are you?

Most Indian module-level electronics businesses fall into one of four shapes. Each starts from a different set of Zoho apps, so place yourself first and the rest of this page reads more clearly.

Design house with an EMS partner

You own the schematic, the firmware and the brand. A contract assembler builds the boards; your own team does potting, flashing, burn-in and final test. Purchase of free-issue parts and the EMS job card are the hard records.

Starts withZoho Inventory job work, a Creator test record

Plant with its own SMT line

Reels, solder paste, stencils and reflow profiles are yours to manage. Component lot traceability and moisture control become daily work, alongside test and dispatch.

Starts withBatch-tracked components, a Creator build traveller

Module maker embedding electronics

The optimiser or smart junction electronics ships inside your own modules. Its serial has to ride along with the module serial, and returns arrive through the module warranty route.

Starts withPaired serials in Zoho Inventory, Zoho Desk for claims

Assembler of imported kits

You bring in populated boards or sub-assemblies, then do housing, leads, final test and packing in India. Landed cost per unit and incoming inspection carry most of the weight.

Starts withPurchase with landed cost, incoming inspection log

Building complete string or hybrid inverters rather than module-level units? The process is close but the test regime and the buyers differ, so start at our page on software for solar equipment makers, and see ERP for PCB and PCBA plants if board assembly is the bigger part of your business.

How one optimiser is made

What does a power optimiser pass through between the component reel and the roof?

Six stages: receiving parts, board assembly, firmware, housing and potting, burn-in with final test, then serial, dispatch and field life. Scroll the line; the rail follows the stage, each scene names the Zoho app or custom Creator app holding that record, and every number shown is Sample.

  1. Reels and lots
  2. Board assembly
  3. Firmware release
  4. Housing and potting
  5. Burn-in and final test
  6. Serial, dispatch, field

Stage 1 · Reels and lots

Every reel gets a lot number before it reaches a feeder

Power switches, gate drivers, inductors, capacitors and the controller chip arrive on reels and trays. Stores records the supplier lot and date code on the receipt, labels the reel, and logs when a moisture-sensitive bag is opened so the floor-life clock starts. Parts that fail incoming checks are moved to a hold location rather than mixed back into stock.

  • Zoho Inventory (batch tracking)
  • Zoho Creator (custom moisture log)

Stage 2 · Board assembly

Boards are built against a released work order, at home or at the EMS

The work order fixes the board revision and the parts list. Paste is printed, parts are placed, the panel goes through reflow, then optical inspection and in-circuit test. Each board gets its own serial and inherits the reel lots issued to that work order. When an EMS partner builds the boards, the free-issue parts go out on a job-work challan and come back as assembled boards with the partner's test summary attached.

  • Zoho Inventory (work orders, job work)
  • Zoho Creator (custom build traveller)

Stage 3 · Firmware release

Only an approved firmware build reaches the flashing jig

Engineering releases a firmware version with its checksum and the board revisions it supports. The jig operator scans the board, the station loads the approved file, writes the unit identity the monitoring gateway will later read, and returns a pass with the checksum. A board flashed with anything other than the current release is stopped before it reaches potting.

  • Zoho Creator (custom firmware register)
  • Zoho WorkDrive

Stage 4 · Housing and potting

The board is sealed in with its leads, and the potting batch is recorded

The flashed board goes into its housing, the input and output leads with their connectors are fitted and torqued, and the cavity is filled with potting compound. The compound's batch, the mix ratio and the cure time are logged against the units filled. Cable sets often come from an outside supplier, so their lot travels with the unit too.

  • Zoho Inventory (assemblies, batches)
  • Zoho Creator (custom potting log)

Stage 5 · Burn-in and final test

Each unit earns its serial label by passing a powered soak and a final test

Units run powered in the burn-in rack for the time your quality plan sets. Then the end-of-line station checks conversion, tracking behaviour, the low-voltage safe mode, communication with the gateway and insulation. The station's result file is read into a Creator test record against the unit serial, so a failure goes to rework with its reason and the operator who saw it.

  • Zoho Creator (custom test record)
  • Zoho Analytics

Stage 6 · Serial, dispatch and field life

The serial on the roof opens the whole history of that unit

Passed units are labelled, packed and added to finished stock by serial. The distributor or EPC invoice lists every serial with its e-invoice and e-way bill details. When an installer maps units to a site in your monitoring platform, that site reference can come back to the serial record. Years later a return ticket shows the board, the reel lots, the firmware build, the burn-in slot and the buyer in one view.

  • Zoho Inventory
  • Zoho Books
  • Zoho Desk

Unit genealogy

What should one optimiser serial be able to tell you?

Seven links, kept from the day the unit is built. Zoho Inventory holds serials on finished units and batches on parts; the links between a unit and the specific lots, firmware and test inside it sit in a custom Creator genealogy app.

Unit serialThe number printed on the label and read by the monitoring gatewayZoho Inventory
Board serial and revisionWhich PCB build, from your line or the EMS partner, and its inspection resultCreator genealogy
Component lotsReel lots and date codes for the power switches, controller and magnetics issued to that work orderInventory batches + Creator
Firmware buildVersion and checksum written by the jig, plus any later field update you recordCreator firmware register
Potting and cable lotsCompound batch, cure log and the cable-set lot fitted to the housingCreator potting log
Burn-in and final testRack slot, soak result and end-of-line readings with the operator nameCreator test record
Buyer and siteInvoice, distributor or EPC, and the site reference returned from installer registrationBooks + custom link

Why it matters: when a supplier warns about one component lot, you can list the affected serials and their buyers in minutes instead of recalling a whole month of production. How far back you need the chain is your quality team's call; we build to that.

Options for optimiser makers

Which of our three solar options fits an optimiser plant?

Our three solar options are Zoho Solar, Zoho Solar + Custom and a complete end-to-end solar product. We recommend the option that fits your business once we have walked one unit through your plant. The table compares them with the spreadsheet, shared drive and Tally setup many electronics plants start from.

Spreadsheets and Tally compared with three Elite Tech Corp solar options for a power optimiser manufacturer
Plant task Spreadsheets, shared drive, TallyA common starting point Zoho SolarOptimiser workflows configured on standard Zoho apps Zoho Solar + CustomZoho apps with custom apps, portals and integrationsUsual for serial-level traceability Complete end-to-end solar productOur own product, covering cells to service desk
Component lot and date code on receiptMarker pen on the reel labelInventory batch per reel lotBatches plus moisture logIncluded
Free-issue parts at an EMS partnerChallan copies in a fileJob-work stock in InventoryJob work plus EMS test summaryIncluded
Approved firmware per board revisionFile on the jig laptopDocument in WorkDriveCreator firmware registerIncluded
Burn-in and end-of-line result per serialCSV per stationCustom fields onlyTest record read from station filesIncluded
Unit to component lot genealogyNot possibleNot in standard appsCreator genealogy appIncluded
Serial list on GST invoice with IRNTally, serials typedZoho BooksZoho BooksIncluded
Distributor orders and price listsPhone and WhatsAppZoho CRMCRM plus distributor portalIncluded
Warranty return by serialEmail threadZoho Desk ticketDesk with full unit historyIncluded

An assembler of imported kits with one product line can often start on Zoho Solar. A plant that needs to answer "which units carry this lot?" will need the custom genealogy and test apps. The written proposal names every custom app and why it is there.

Technical boundary

Where does Zoho stop and your test stations and engineering tools take over?

Zoho covers stock, batches, serials, purchase, sales, invoices and service tickets natively. Firmware registers, build travellers, test records and genealogy are custom Creator apps. Circuit design, the SMT line programs, test station software and certification stay in your engineering tools, connected by files or an API.

Standard Zoho, configured for optimisers

  • Batch tracking for reels, potting compound and cable sets
  • Serial numbers on finished units
  • Assemblies and work orders for boards and finished units
  • Job-work stock at an EMS partner
  • Purchase orders, bills and landed cost for imported parts
  • Distributor and EPC quotes, orders and price lists
  • GST invoices with IRN and e-way bill fields
  • Return tickets and dashboards

Optimiser apps we build in Creator

  • Moisture-sensitive bag and floor-life log
  • Build traveller from board to finished unit
  • Firmware register with release approval
  • Potting and cure log
  • Burn-in and end-of-line test record per serial
  • Unit genealogy and lot recall search
  • Distributor ordering portal

Stays with engineering and the line

  • Schematic, layout and firmware source code
  • Pick-and-place, reflow and AOI machine programs
  • Test station software and its limits
  • Your monitoring cloud and gateway firmware
  • Type tests, certification and lab reports

On standards and certification: the system can hold the certificate numbers, lab report references and validity dates your quality team records for each product model. It does not certify a product, set test limits or submit anything to a regulator or test lab. Those stay with your engineers and your compliance lead.

By product line

How does the setup change for each kind of module-level product?

The six making stages hold for all of them; the pairing, the tests and the buyer change. These are illustrative setups for five product lines. Pick the one nearest yours.

Single-module optimisers for rooftops

The volume product: one unit per module, sold through distributors to rooftop installers who fight shading and mixed roof faces. Stock levels at distributors and quick return handling decide reputation.

  1. Distributor order
  2. Build to forecast
  3. Burn-in and test
  4. Ship by serial
  5. Installer registration

CRM for the distributors who stock your units

  • Usually fitsZoho Inventory, CRM, Books and Desk, plus a Creator test record
  • Key setupDistributor price lists, reorder levels, serials on every invoice
  • Watch forReturns booked against the wrong buyer because serials were not scanned at packing

Automations

Which optimiser plant alerts can fire without anyone watching a screen?

Six rules electronics plants usually want first. You set the thresholds and the people told; we build the trigger and what follows.

  • WhenAn opened moisture-sensitive reel nears the end of its floor lifeStores is told to bake or reseal it before the next shift loads it.Zoho Creator
  • WhenA board is scanned at the jig with an unapproved firmware fileThe flash is refused and the engineering lead gets the board serial.Creator firmware register
  • WhenBurn-in failures in one rack cross your limitThe lot is put on hold and quality sees the slots and boards involved.Creator test record with Zoho Analytics
  • WhenA supplier flags a component lotA list of affected unit serials, their invoices and buyers is prepared for review.Creator genealogy search
  • WhenFree-issue parts sit at the EMS partner past the agreed daysPurchase gets a reminder with the challan and the quantity still out.Zoho Inventory job work
  • WhenAn installer reports a unit by serialA return ticket opens with the unit's build history and the distributor who sold it.Zoho Desk with a Creator lookup

License cost

How much do Zoho licenses cost for an optimiser manufacturer?

Logins drive most of the bill. Zoho Inventory is priced per organisation, with Standard at ₹999 a month on yearly billing, plus GST. Line, test and quality staff who enter records in Creator apps each need a Creator user. Choose a plan below to see a figure at Zoho's India list prices.

  • Estimate only; licenses are billed by Zoho itself
  • Operators at the jig and test stations count as Creator users
  • Our setup and custom apps are one fixed price in a signed scope

Connections

What does an optimiser ERP on Zoho connect to on the line and in the field?

CRM, Inventory, Books and Desk share optimiser records natively. Test stations, flashing jigs, label printers and your monitoring cloud connect through result files or an API, and we check each one with your engineers before quoting. Each connection shows its type below.

Inside Zoho

Sales, stock and money in one chain

  • Zoho CRM to Zoho Inventory for distributor and EPC orders Native
  • Zoho Inventory to Zoho Books for stock value, import bills and invoices Native
  • Zoho Desk return tickets linked to the buyer and serial Native

On the line

So the record follows the unit

  • End-of-line and burn-in stations through their result files Custom
  • Firmware flashing jig checking the approved build before it writes Custom
  • Serial and carton label printers fed from the unit record Custom
  • EMS partner test summaries imported per board lot Custom

In the field and in accounts

So the roof and the ledger agree

  • Your monitoring cloud returning installer site references by serial Custom API
  • IRN and e-way bill on serial-listed invoices through Zoho Books India Native
  • Tally balances and open items moved at a period end Custom
  • Payment collection from distributors through gateways Zoho Books supports Marketplace

Rollout order

In what order should an optimiser plant move onto Zoho?

Serials and item codes first, because every test and return hangs off them; the line keeps shipping on its current method until each piece is proven. Dates are agreed in the signed scope, since an EMS-based design house and a plant with its own SMT line need different plans.

  1. 1Walk one unitFrom reel to installer with stores, production, test, quality and sales.
  2. 2Settle the optionOne of our three solar options, with every custom Creator app listed by name.
  3. 3Codes and serial rulesItem masters cleaned, serial format fixed, open stock and reels counted by lot.
  4. 4Stores and purchase liveReceipts with lots, EMS job work and imports with landed cost, old sheets kept as backup.
  5. 5Line and test pilotFirmware register, test record and labels tried on one burn-in lot.
  6. 6Train and reviewStaff trained in English, Hindi, Marathi, Tamil, Kannada or Malayalam, then a review after the first month end.

Free requirements checklist

What must your optimiser plant fix first?

Twelve needs that module-level electronics makers raise most. Tick yours and send the list: it fills the form below, so our solar expert comes to the meeting with a first view of the option that suits you.

0 of 12 optimiser needs ticked

Stores and purchase
Build and firmware
Test and quality
Sales and field

Meet us

Where can an optimiser manufacturer meet our team?

On your shop floor when seeing the jig and the burn-in rack helps, at our Bengaluru office by appointment, or on video from anywhere in India. Operator training for test and stores staff works best at the plant, between shifts.

Vasanth Nagar, Bengaluru

Visit #39, 8th Main Road, Vasanth Nagar, Bengaluru 560052 with a sample test file and a unit label. Meetings are by appointment with our Bangalore Zoho partner team.

Electronics plants near Bengaluru

Visits to electronics and power-electronics units in Electronic City, Bommasandra, Peenya and the Hosur road belt when walking the line saves a week of calls.

Electronics units in Tamil Nadu or Kerala

Our head office in Coimbatore and branch in Kochi sit closer to southern plants.

Training for the line and the office

Stores, jig, test, quality and accounts staff can be trained in English, Hindi, Marathi, Tamil, Kannada and Malayalam.

Optimiser plant in another state?

We walk your unit flow on video first and visit for the pilot lot if that helps. Book your meeting with our solar expert today

Client feedback

Before you meet us, what have Zoho clients written about our team?

We have delivered many solar projects, though the quotes below were published by Zoho clients from other industries, and the optimiser plant flow on this page is illustrative, with Sample data.

The team at Elite Tech Corporation is highly knowledgeable and extremely supportive. They took the time to understand each of our business use cases in detail and approached every requirement with a strong implementation mindset.
KVP EnterprisesFounder and CEO · manufacturing automation
What stood out most was their structured approach, clarity in communication, and commitment to aligning technology with practical, on-ground operations rather than offering generic solutions.
MegawinFounder and CEO · multiple Zoho applications
Your understanding of our requirements and customization of Zoho Books have positively impacted our operations. The successful implementation of APIs and workflows has streamlined processes.
F Care GroupFounder and CEO · Zoho Books, APIs, workflows
TrukkingLulu HolidaysMegawinJADKingsSygaardJemkonBrealantRockolyLendonRohealthTengani

FAQ

Power optimiser manufacturer ERP: common questions

Bring your test engineer and your stores lead to the first meeting. We reply within 1 business hour.

Book your meeting with our solar expert today
What is a solar power optimiser manufacturer ERP?

It is one system for an optimiser maker's purchase, component lots, board builds, firmware releases, test results, unit serials, distributor sales, invoices and warranty returns. On Zoho it combines Zoho Inventory, Zoho Books, Zoho CRM and Zoho Desk, with custom Zoho Creator apps for the firmware register, the test record and unit genealogy.

Can Zoho link each optimiser serial to the component lots inside it?

Not with standard apps alone. Zoho Inventory tracks batches on components and serials on finished units, but the link between one unit and the specific reel lots, board and firmware inside it needs a custom Creator genealogy app. We build that app to the depth your quality team needs.

Our boards are built by an EMS partner. Does that still work?

Yes. The parts you send go out as job-work stock on a challan and stay in your books while they are at the partner. Assembled boards come back against the same job, and the partner's inspection summary can be imported per board lot so the history is not lost.

Can burn-in and end-of-line test results be stored against each unit?

Yes, through a custom Creator test record. Most test stations write a result file; we read those files into the record against the unit serial, with the station, operator and pass or fail. A failure moves the unit to rework with its reason, and retests are added rather than overwritten.

How do you control which firmware version gets flashed?

Engineering releases each firmware build in a Creator register with its checksum and the board revisions it supports. The flashing station checks that register before writing, so an unapproved file is refused. The build written to each unit is saved on its serial record for later field questions.

Which of the three solar options suits a power optimiser manufacturer?

It depends on how deep your traceability must go. An assembler of imported kits with one product line may fit Zoho Solar. A plant that needs unit-to-lot genealogy and per-serial test records usually needs Zoho Solar + Custom. A business that also distributes and services solar equipment may suit the complete end-to-end solar product. We recommend the option that fits your business once we have seen your line, and the reasons go into the proposal.

What do Zoho licenses cost for an optimiser plant?

Zoho bills the licenses directly at its India prices, plus GST. Zoho Inventory Standard is ₹999 a month for the organisation, and each operator using a Zoho Creator Standard app adds ₹480 a month, both on yearly billing. The configuration and any Creator apps we build carry one fixed price, written into a signed scope once the free first meeting is done.

Does the system certify our optimisers or set test limits?

No. It stores the certificate numbers, lab report references and validity dates your quality team enters for each model, and it records results against the limits your engineers set. Product design, test limits, type testing and certification stay with your engineers, the test lab and your compliance lead.

Is solar work new to Elite Tech Corp?

No. We have delivered many solar projects, and the names of those clients stay private. In the first meeting our solar expert follows one of your optimiser units from receipt to dispatch and shows where each record would sit in Zoho.

Optimiser plant review

Book your meeting with our solar expert today

Tell us whether you run your own SMT line or use an EMS partner, how you flash firmware and where test results sit today. We reply within 1 business hour. No obligation.

  • We walk one optimiser unit from component reel to installer registration with your production and quality leads
  • You see which records Zoho keeps, which need a Creator app and which stay on your test stations
  • Meet on video, at your plant, or at Vasanth Nagar in Bengaluru

Tell us about your business

Three short steps. Fields marked * are required.

Your need
Your company
How we reach you

Privacy notice. We collect the details in this form (name, business email, phone, company, city and your requirement) only to reply to your enquiry and arrange the assessment. They are stored in Zoho CRM, the system we use to manage enquiries, and are never sold or used for advertising. The updates box is optional and you can withdraw it at any time. To see, correct or delete your details, or to withdraw consent, call +91 89259 24785 or message us on WhatsApp. Read our privacy policy.