ERP for passenger-car component manufacturers in Chennai
Passenger-car supply, to Hyundai, Renault-Nissan and the legacy Ford base, is programme-driven: launch on time, hit PPAP, hold capacity. Elite Tech runs APQP launches, PPAP packs, capacity planning and traceability so a car programme launches clean.
One platform, built on the tools auto-component manufacturers already trust, Zoho Advanced Partner + custom development on AWS
Made for Chennai's
automotive heartland
For passenger-vehicle component suppliers across Sriperumbudur, Oragadam and Maraimalai Nagar.
The modules a car-component supplier runs on
APQP launch, PPAP, capacity planning and programme traceability.
APQP Launch Control
New-model launches run through APQP stage gates with timing plans.
APQP gatesPPAP Packs
PSW, dimensional, material and control-plan packs held per part and OEM.
PPAPCapacity Planning
Machine and line capacity checked against committed OEM volumes.
CapacityProgramme Traceability
Parts traced by programme, revision and lot for launch and field issues.
TraceabilityGST e-Invoice & e-Way
IRN + QR and e-way bill raised in-system at dispatch, India-native.
e-Invoice IRNOEM Schedule & ASN
Delivery schedules consumed and advance shipping notices raised against them.
EDI & ASNWarranty & Returns
Part-serial linked warranty, returns and 8D corrective action in one place.
Warranty & 8DUnified Dashboards
OEE, PPM, on-time delivery and receivables on one live screen.
KPI cockpitCar programmes, launched clean on PPAP
A car programme is won on launch discipline. The platform runs APQP timing, assembles PPAP packs, checks capacity against committed volumes and traces parts by programme, so a launch is managed, not firefought.
- APQP stage gates and timing plans for every new-model launch.
- PPAP and PSW packs assembled per part, revision and OEM.
- Schedule-driven and order-driven work on the same rails, routed automatically at release.
- Configured Zoho + custom AWS where the line needs it, you own your code and your data.
- APQP Launch Control: New-model launches run through APQP stage gates with timing plans.
- PPAP Packs: PSW, dimensional, material and control-plan packs held per part and OEM.
- Capacity Planning: Machine and line capacity checked against committed OEM volumes.
Explore related solutions: Zoho ERP for Automobiles & Auto-Components in Chennai, ERP for Foundry & Casting Manufacturers in Chennai, ERP for Plastic Injection Molding in Chennai, ERP for Precision Engineering Companies in Chennai, Automotive Procurement & Purchase ERP in Chennai, IATF 16949 Quality ERP in Chennai. Or talk to our Chennai ERP team.
Book your free auto-ERP demo
Tell us about your plant, we'll map the RFQ-to-ASN journey to your workflow and send a fixed-scope plan.
Two workflows, one connected platform
The manufacturing heart and the sales journey, side by side. Click any stage to walk through exactly what happens at that step.
The manufacturing heart
Machining & Press
Turned and milled parts, stampings, die-castings and forgings run against per-part routings, with standard times, first-piece approval and tool-life tracking.
Stage 1 of 5Per-part routings
Standard times set for every operation.
First-piece approval
Sign-off before the batch runs.
Tool / die life & OEE
Downtime captured live for OEE.
Surface treatment
Heat-treatment, plating, phosphating, e-coating and painting, in-house or job-worked, are tracked and checked before parts feed assembly.
Stage 2 of 5Process parameters
Bath, temp and time to spec.
Job-work challan
ITC-04 tracked for outsourced work.
Coating inspection
Thickness and adhesion checked.
Assembly
Sub-assembly, fastening to torque spec, poka-yoke checks and marking. The part's lot / serial identity is born here.
Stage 3 of 5Torque & poka-yoke
Error-proofed assembly steps.
Part marking
Laser / dot-peen with QR or DMC.
Lot / serial genesis
Traceable identity assigned.
Inspection & SPC
Gauging, functional test and statistical process control per characteristic; out-of-control trends are flagged live from the shop floor.
Stage 4 of 5Control plan
Characteristics checked to plan.
SPC & Cp/Cpk
Capability tracked in real time.
Rejection / rework
PPM logged, 8D triggered.
PPAP sign-off
Quality approves the lot or holds it. On pass, the work order closes and the parts rejoin billing, ASN and dispatch.
Stage 5 of 5PPAP pack
Records captured to the lot.
Rework loop
Back to the right station.
Handover
Released, then to dispatch.
The RFQ-to-ASN journey
The RFQ lands
An OEM or Tier-1 RFQ, for example a machined bracket, EAU 60,000, auto-creates a lead with customer, part and drawing tagged.
Step 1 of 6Omni-channel capture
Portal, EDI, email, IndiaMART.
Account routing
Auto-assigned to the key-account rep.
Duplicate check
One clean, de-duplicated enquiry.
Should-cost, built up
Material, process, tooling and overhead costed into a should-cost quote, with target margin and approval workflow.
Step 2 of 6Material & process
Net weight, scrap, cycle times.
Tooling & overhead
Amortised tool and burden rates.
Margin & approval
Sign-off before it goes out.
Nominated & won
The part is nominated; a deal and customer account are created and a Blueprint enforces APQP and PPAP before Start of Production.
Step 3 of 6Customer account
Contact and account created.
Part & price
Part master and price agreed.
APQP Blueprint
Nomination to SOP gates.
The schedule drives the plant
OEM delivery schedules and EDI releases flow in, become material and production plans, and pull parts just-in-time / just-in-sequence.
Step 4 of 6EDI release
Firm and forecast quantities.
MRP & pull
Material and JIT/JIS pulls.
Kanban
Line replenished to demand.
Dispatched, invoiced, ASN
Dispatch raises a GST invoice, e-invoice (IRN) and e-way bill, plus the ASN with barcode / QR labels; stock decremented.
Step 5 of 6Schedule to invoice
Dispatch becomes a GST invoice.
IRN, e-way & ASN
Compliance and ASN in-system.
Receivables
Payment link and ledger update.
Aftermarket & the full picture
Warranty returns per lot, field failures with 8D, aftermarket / spares orders, and OTIF-to-revenue dashboards for owners.
Step 6 of 6Returns & 8D
Traced to lot and process.
Aftermarket orders
Spares and replacement parts.
Dashboards
OTIF, PPM and revenue, live.
Zoho products, tuned for auto-components
Every Zoho product mapped to a real auto-component job, from the first RFQ to the last warranty return, extended with custom AWS where the shop floor needs it.
End-to-end manufacturing backbone
Orders, BOMs, work orders, inventory and GST costing unified in one ERP that runs the whole Chennai auto-components plant.
RFQ & key-account management
Every OEM and Tier-1 RFQ captured, costed and routed. Pipelines, quotes and part price lists in one place.
Zoho InventoryStock & multi-warehouse
Lot- and serial-traceable stock from raw-material heat number to the dispatched part and its ASN.
Zoho BooksGST-ready finance
GST-native billing with e-invoice (IRN) and e-way bill built in, plus part- and customer-wise profitability.
Production & sales dashboards
OEE, PPM, OTIF, dispatch and receivables in one live view for owners on any device.
Custom shop-floor apps
Job cards, SPC capture, gauge and inspection apps. Mobile-first, low-code, built to your process.
Aftermarket & warranty
Lot-linked warranty returns, field complaints, 8D and spares with a self-service customer portal.
Field service & line support
Schedule line-support and containment visits, dispatch technicians and capture service on mobile.
APQP & new-part development
Plan rollouts, APQP / new-part development and plant projects with tasks, milestones and gantt.
Shop-floor HR & payroll
Attendance, shifts and payroll for operators, setters and staff across the plant.
Digital signatures
e-Sign quotations, supply agreements and purchase orders. No printing, no couriers.
Integration & automation
Wire Zoho to AWS, machines, EDI and OEM portals. Automate every hand-off between apps.
Why Elite Tech Corporation for auto-components
A complete Zoho & AWS partner that builds the custom apps generic ERPs can't, purpose-fitted to how Chennai's auto-component makers actually win, plan and build.
Zoho + ETC custom apps
Where standard Zoho stops, we build custom apps on Zoho Creator and AWS, and you own the code in your own repository.
Zoho for auto-industry automation
Pre-built auto BOMs, IATF 16949 / PPAP flows, OEM schedule pulls, ASN and dashboards, shaped for component production out of the box.
Auto-specific, not generic
We speak castings, forgings, stampings, machined parts, PPAP and OEM schedules, not a horizontal ERP retrofitted to auto parts.
You own your code & data
Custom code in your private Git repo, data in your own tenant. No black-box lock-in, ever.
Proven, and close to Chennai
A Zoho Advanced Partner with 250+ implementations and a Bangalore office 40 km away, on the ground and in your timezone.
Zoho ERP vs traditional ERP for Chennai passenger-car component makers
A side-by-side look at how a Zoho ERP delivered by Elite Tech compares with legacy and generic ERP software for a Chennai auto-component manufacturer.
| Criteria | Zoho ERP + Elite Tech | Traditional / other ERP |
|---|---|---|
| Upfront cost | Low, subscription (OPEX), no heavy hardware | High, big licence + servers (CAPEX) |
| Go-live time | 15-60 days, phased rollout | 6-18 months |
| Auto-industry fit | Pre-built auto workflows, IATF 16949, PPAP, OEM schedules | Generic,heavy customisation to fit |
| GST e-invoice & e-way bill | ✓ Built-in, India-native | ✕ Add-on / third-party bolt-on |
| IATF 16949 / PPAP quality | ✓ Native APQP, PPAP, SPC & traceability | ✕ Custom development required |
| OEM EDI, schedules & ASN | ✓ Schedule pull, JIT/JIS & ASN built in | ✕ Manual or costly add-on |
| Custom apps | Zoho Creator + custom AWS,you own the code | Costly change requests, vendor-controlled |
| Cloud & mobile | Cloud-native, mobile-first | Often on-premise, desktop-bound |
| Local support | Bangalore-Chennai team, in your language | Remote / partner-dependent |
| Scale as you grow | Add users & modules à la carte | Expensive tier jumps |
| Data & lock-in | ✓ Own your data & code | ✕ Proprietary, hard to exit |
ERP for Passenger Car Component Makers in Chennai,your questions answered
Yes. New-model launches run through APQP phases with timing plans, deliverables and sign-offs tracked to date.
Yes. PSW, dimensional results, material certs and control plans are held per part number, revision and customer.
Yes. Machine and line capacity is checked against committed and forecast OEM volumes to flag bottlenecks early.
Yes. Parts are traced by programme, revision and lot so a field concern maps to the affected build window.
Most Chennai suppliers go live on the core schedule-to-dispatch flow in 15 to 60 days, with production and quality modules following in phased rollouts.
Yes. GST invoice, e-invoice (IRN + QR) and e-way bill are generated inside the system at dispatch, India-native, no third-party bolt-on.
Yes. Delivery schedules, ASN dispatch, PPAP and APQP records and part-serial traceability are all part of the platform.
Explore more automotive & auto-components ERP
Purpose-built modules and Chennai location pages across the Elite Tech automotive ERP platform.

Ready to run your auto-components business on one platform?
Talk to our Chennai team, or pick a slot that suits you. Bring your toughest OEM schedule and messiest BOM, we'll show you how it flows, RFQ to ASN.
